Loading…
Loading…
9,268 results • Best match
Repair and Maintenance of existing Water Supply System of Palam ward in Palam Consituency AC-37 Under EE(C)-26(Re-invite-I).
Repair and Maintenance of existing Water Supply System of Palam ward in Palam Consituency AC-37 Under EE(C)-26(Re-invite-I).
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/Dugwell At. Jevalwahi Tola 1 In Gp. Chicholi Tah. Dhanora Dist. Gadchiroli
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/Dugwell At. Jevalwahi Tola 1 In Gp. Chicholi Tah. Dhanora Dist. Gadchiroli
P/L Interlocking tiles,sewer line and water supply line in remaining street of Pipal Wali Gali Kothi Wala Rah W No.3
P/L Interlocking tiles,sewer line and water supply line in remaining street of Pipal Wali Gali Kothi Wala Rah W No.3
P/L Water Supply Line in Ward No. 57, Bhagat Singh Nagar No. 1, 2 and 3, Indira Nagar, Lakshami Nagar, Goregaon (W)
P/L Water Supply Line in Ward No. 57, Bhagat Singh Nagar No. 1, 2 & 3, Indira Nagar, Lakshami Nagar, Goregaon (W)
Rectification Works of 1 nos Small Water Supply Schemes Under Package-3 of Nedumkandam GramaPanchayath in Idukki District
100.9.5 Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials)50 MM
REPAIR/MAINT OF EXTERNAL WATER SUPPLY CI/GI/PPR PIPE LINES, VALVES ETC AT SE FALLS AREA UNDER GE SHILLONG
S&F in repalcment 75mm bore 3- layer PP-R (Polypropylene random copolymer) pipes SDR 7.4 & PN 16 stablised and antimicrobial fusion welded having thermal stability for hot & cold water supply incl all PP-R plain & brass threaded polypropylene random fittings such as male/female threaded socket, male/female threaded tee, reducers, union, socket, end cap, plug, etc laid in trenches/wall/floor incl connection from water main GI/PPR pipe incl taking down old unsv pipe complete all as specified and directed. Note - excavation will be measured and paid seperately under relevant item.