Loading…
Loading…
9,265 results • Best match
Augmentation of Water Supply Scheme For Village Bhattia Bet Block Ludhiana-II District Ludhiana Under Head NABARD XXXI
Name of the Work:- Augmentation Of Water Supply Scheme For Village Bhattia Bet , Block Ludhiana-II, District Ludhiana (Under Head NABARD-XXXI)
Canal Water Based Water Supply Project for Construction of 4.00 MLD Water Treatment Plant (WTP) and other related works including 5 years Operation and Maintenance (Part-2) at Bhai Rupa Town, District Bathinda Punjab under AMRUT 2.0 Scheme
Canal Water Based Water Supply Project for Construction of 4.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 05 years and Supplying, Installation, Testing of Solar Panels including other required equipment as per Guidelines of Punjab Energy Development Agency (PEDA) over Raw Water S&S Tanks of Water Treatment Plants with Operation and Maintenance for a period of 07 years
Canal Water Based Water Supply Project for Construction of 3.0 MLD Water Treatment Plant (WTP) and other related works incluidng 5 year O and M (Part 2) at Mudki Distt Ferozepur Punjab Under AMRUT 2.0 (E Tender 90)
Canal Water Based Water Supply Project for Construction of 3.0 MLD Water Treatment Plant (WTP) and other related works including 5 years’ Operation and Maintenance at Mudki Town, District Ferozepur, Punjab under AMRUT 2.0 Scheme
Supply delivery and carrying of liquid chlorine gas of 100 kg each capacity cylinder with testing of cylinder for Jangipur OHR site, Raghunathganj-I OHR sites, Beniagram OHR site, Central sector OHR sites under Surface water based water supply scheme
Charges for replacement of cylinder valve, cylinder seal nut, cylinder spindle, cylindrical cap and cylinder teflon washer if required including painting complete as per direction of the EIC. TERMS AND CONDITIONS:- 1.Carrying and loading unloading as per safety norms of filled cylinder should be taken carefully. 2. Payment will be made on actual number of supply of filled up container against document of Filling station and document needed for sl no. 4 and 5 3. All work s should be taken up asper direction of EIC. 4. EIC will stipulate requirement of filled up container 5. All works as per ISS including testing of empty container prior filling.
Balance works for Improvement to Water Supply Services in Pansemal Nagar Parishad in Barwani District in Madhya Pradesh for package MPUSIP_ Package 2B
Geotechnical investigation (Safe Bearing Capacity of 15 t/m2 or as per the soil investigation report which ever is less), Designing (structurally, hydraulically & aesthetically), (Water retaining structure shall be designed by working stress method confirming IS 3370-2009) Constructing and commissioning Water Treatment Plant of 1.20 MLD Production capacity in 22 hour operation with aeration, chemical storage, chemical mixing arrangement, coagulation, sedimentation, rapid gravity filtration, Covered (RCC Roof) filter bed with side wall & glass windows & ventilation, sludge drying bed (atleast for 07 days drying time), back wash water storage tank, disinfection with chlorination (based on chlorine dosing rate of 5ppm), treated water storage for 45 minutes capacity and pump House, back wash water recovery plant, Sludge Sump, Water analysis laboratory, Annex Building, MCC panel room, control room, chlorine dosing tank, chlonator Room, Tonner room, Separate Administrative block (Min.107 Sq.m) , Staff Quarter (Min. 52 Sq.m.), basic PLC based data aquisition for data monitoring electrical parameters of drive motor & power supply, water quality measurement, online flow and pressure measurement, Security Cabin with toilet block (minmum 13 Sq.m), landscaping, lighting, compound wall (2.10 m height above FGL), drainage, Internal plant road & approach road CC as per MoRTH specifications of 3.75 m width & connected to exisiting main Road including cost of process design, cost of all civil, mechanical, electrical and instrumentation works. Construction, installation, commissioning, testing & trial run for 3 months etc. complete in all respect as per Standard specifications, satisfaction of Engineer-In-Charge.
Design and Construction of Balance Work Piped Water Supply Scheme under Jal Jeevan Mission at Village - Pahadi Bujurg Block Palera distt. Tikamgarh
Design and Construction of Balance Work Piped Water Supply Scheme under Jal Jeevan Mission at Village - Pahadi Bujurg Block Palera distt. Tikamgarh based on including installation of electric submersible water motor pump, distribution pipe line system, household tap connections, electric power connections including cost of all material & labour with 90 Days Trial Run/Commissioning period as per BOQ enclosed. (As per Detailed BOQ Attached with detail NIT)