Loading…
Loading…
9,443 results • Best match
REPAIR/REPLACEMENT OF EXTERNAL WATER SUPPLY LINES (GI/HDPE) OF ZONE A AND B AT PATIALA MIL STN UNDER GE (N) PATIALA
Supply only calcium hypochlorite 65% to 70% chlorine content in granular form, calcium based granular chlorination chemical all as specified and directed. Make of product - DECLIBAC/PURI CHLOR/AQUAFITAQUA PURA or equivalent as approved by GE. Note : (i) High strength calcium based granular chlorination chemical to packed in plastic drum of 45 Kgs each. (ii) The brand and make of the chlorination chemical must be stated and certificate of Hygiene & Public Health (Govt of India) conforming compliance to all the above specification technical strength, stability, health, safety and operational point of view as well as the fact that this product is used for water supply installations.
Operation and Maintenance of Rural water supply scheme Badliyas under sub division Kotri Under jurisdiction of Division Shahpura District Bhilwara
Distribution of water charges bills to consumers of various categories at hteir premises under urban / rural water supply schemes as per billing cycle (450 nos)
Water supply leakages and laying of water lines at various places in Manikonda ward no.127 and Neknampur ward no.128 Narsingi Circle-45, SLP Zone, CMC .(ITEM NO.1)
Operation and Maintenance of Iron Elimination Plants at Berachampa Zone-I Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Opening & closing of all the different dia sluive valves on different places along the alignment of the rising main and distribution main within Head Works Site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [The agency shall have to pay the guard @ Rs. 421.00 + 22.00 + 22.00 + 22.00 = 487.00 {As per Order of Additional Chief Secretary to the Government of West Bengal, Vide Memo No.- PHE/1095, Dated.- 22/05/2025 }/ Head/ Day as Wage + 8.33% bonus. Payment receipt of wage to be submitted monthly and bonus to be paid before Puja/ Idal Utsav on proper receipt] N.B. : Rate per day per Head = (Rs.487.00 + 8.33% Bonus)= 527.57 + 24.35 {5% Overhead Expenses}= 551.92 + 52.76 + (Add Contractor profit 10%) =604.68 And ESIC Contribution of Employers @3.25% & EPF Contribution of Employers @11% = Rs [604.68 +15.83 +63.31] = 683.82 = 684.00 Note : Considering ESIC & EPF applicable 30 days per month vide order no. PHE/1095/0-5/16(PT) Dt.- 22-05-2025 w.e.f. 01/04/2025 = (487 x 12 months x 26 days) /365 days). [Emplyees Contribution of EPF & ESIC will be deducted from his daily wages]
Operation and Maintenance of Iron Elimination Plants at Berachampa Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Opening & closing of all the different dia sluive valves on different places along the alignment of the rising main and distribution main within Head Works Site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [The agency shall have to pay the guard @ Rs. 421.00 + 22.00 + 22.00 + 22.00 = 487.00 {As per Order of Additional Chief Secretary to the Government of West Bengal, Vide Memo No.- PHE/1095, Dated.- 22/05/2025 }/ Head/ Day as Wage + 8.33% bonus. Payment receipt of wage to be submitted monthly and bonus to be paid before Puja/ Idal Utsav on proper receipt] N.B. : Rate per day per Head = (Rs.487.00 + 8.33% Bonus)= 527.57 + 24.35 {5% Overhead Expenses}= 551.92 + 52.76 + (Add Contractor profit 10%) =604.68 And ESIC Contribution of Employers @3.25% & EPF Contribution of Employers @11% = Rs [604.68 +15.83 +63.31] = 683.82 = 684.00 Note : Considering ESIC & EPF applicable 30 days per month vide order no. PHE/1095/0-5/16(PT) Dt.- 22-05-2025 w.e.f. 01/04/2025 = (487 x 12 months x 26 days) /365 days). [Emplyees Contribution of EPF & ESIC will be deducted from his daily wages]
Road Restoration of BHINGOLE Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte. in the district of Malda.
Dismantling all type of plain cement concrete works, stacking serviceable materials of site and removing rubbish as directed within a lead of 75mtr. for laying all dia pipe line in ground floor, a) upto 150mm thick.