Loading…
Loading…
9,529 results • Best match
AUGMENTATION WATER SUPPLY SCHEME FOR VILLAGE SODHON BLOCK PHILLAUR DISTRICT JALANDHAR Tubewell OHSR Pipe Line etc as per DNIT
WATER SUPPLY
Rectification Works of 2 nos Small Water Supply Schemes Under Package-1 to Marangattuppally Grama Panchayath in Kottayam District
Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 90mm Nominal Outer Diameter pipes.
GMO:- Provision of deep tube well with pump house at North & South side colony for supply of water to station & colony at GMO.
local sand, with common burnt clay non modular bricks. Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished 11.3 with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone Sqm 48 545 26160 15 aggregate 13.0 FINISHING 13.1S CEMENT PLASTER (IN FINE SAND) 13.1 12 mm cement plaster of mix : 16 13.1.1 1:4 (1 cement: 4 fine sand) Sqm 480 294.85 141528 CEMENT PLASTER WITH A FLOATING COAT OF 13.7S NEAT CEMENT 12 mm cement plaster finished with a floating 13.7 coat of neat cement of mix : 17 13.7.1 1:3 (1 cement: 3 fine sand) Sqm 72 374.15 26938.8 13.16S 6MM CEMENT PLASTER 13.16 6 mm cement plaster of mix : 18 13.16.1 1:3 (1 cement : 3 fine sand) Sqm 48 253.05 12146.4 Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 13.42 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. 19 13.42.1 Two or more coats on new work Sqm 240 92.75 22260 13.44S EXTERIOR FINISHING Finishing walls with water proofing cement paint 13.44 of required shade : 13.44.1 New work (Two or more coats applied @ 3.84 Sqm 210 97.6 20496 20 kg/10 sqm) Painting with synthetic enamel paint of approved 13.61 brand and manufacture to give an even shade : 21 13.61.1 Two or more coats on new work Sqm 60 131.45 7887 18.0 WATER SUPPLY 18.4S PP-R PIPES DHANBAD DIVISION-ENGINEERING/EAST CENTRAL RLY Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water 18.6 supply, including all PP - R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. -External work 22 18.6.5 PN - 10 Pipe, 50 mm OD (SDR-11) Metre 480 568.6 272928 23 18.6.9 PN - 10 Pipe, 110 mm OD (SDR-11) Metre 768 1689.5 1297536 18.7S C.P.V.C. PIPES Providing and fixing G.I. pipes complete with G.I. 18.10 fittings and clamps, i/c cutting and making good the walls etc.-Internal work - Exposed on wall 24 18.10.5 40 mm dia nominal bore Metre 468 725.15 339370.2 25 18.10.6 50 mm dia nominal bore Metre 384 893.2 342988.8 Providing and fixing G.I. pipes complete with G.I. 18.12 fittings including trenching and refilling etc.- External work 26 18.12.6 50 mm dia nominal bore Metre 768 654.2 502425.6 18.15S BRASS FITTINGS Providing and fixing gun metal gate valve with 18.17 C.I. wheel of approved quality (screwed end) : 27 18.17.3 40 mm nominal bore Each 12 707.3 8487.6 28 18.17.4 50 mm nominal bore Each 12 878.25 10539 18.31S C.I. SLUICE VALVES/ FIRE HYDRANTS & FIXTURES Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. 18.31 (the tail pieces if required will be paid separately) : 18.31.1 100 mm diameter 29 18.31.1.2 Class II Each 12 4500.25 54003 Total 5097209.55
Improvement of LC by providing piped water supply and furniture at various LC gates under jurisdiction of Sr. DEN/3/SEE.
18.0 WATER SUPPLY
Ratlam Division - Electrical work in connection with Augmentation of water supply arrangement at various 12 stations in connection with Simhastha 2028.
Ratlam Division - Electrical work in connection with Augmentation of water supply arrangement at various 12 stations in
Canal Water Based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant (WTP) and other related works incluidng 5 year O and M (Part 2) at Mallanwala Khas, Distt Ferozepur Punjab Under AMRUT 2.0 Scheme (E Tender 90)
Canal Water Based Water Supply Project for Construction of 5.0 MLD Water Treatment Plant (WTP) and other related works including 5 years’ Operation and Maintenance (Part-2) at Mallanwala Khass, District : Ferozepur, Punjab under AMRUT 2.0 Scheme