Loading…
Loading…
9,556 results • Best match
Operation and Maintenance of CI /DI / HDPE / UPVC / AC /GI Rising Main and Distribution System for Shibalaya Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Supplying, laying, fiting, fixing and jointing of UPVC pipes onforming to IS:4985-2000 with latest revision and amendments, if any, with ecessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing elephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as pplicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good uality/approved brand solvent cement (as per IS:14182-1994 cluding cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as equired at site by adopting suitable method so as to facilate the aintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with istribution pipes etc. all complete as per drawing direction and atisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to beproduced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate ofentire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (PHED SOR 2019, P-L.3-5, It-2(ii) ) (A) Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials butexcluding cost of valves.
Supply of water Tankers with Vehicle Tracking System on Hire basis of 4000 Liters capacity to transport Drinking Water to Unserved areas of 1 to 5 Divisions in Machilipatnam Municipal Corporation. (2nd Call)
Supply Erection and Commissioning of Super Heater water wash heat exchanger mond with MS seamless Pipe line and Control Valves
Supply Erection and Commissioning of Super Heater water wash heat exchanger mond with MS seamless Pipe lines and Control Valves (As per the attached Tender documents and Technical specification)
REPAIR/MAINT/ REPLACEMENT OF WATER SUPPLY MOTOR PUMP SET AND CONNECTED ITEMS UNDER GE (A) SURATGARH AT SURATGARH MIL STN
Supply and laying double wall corrugated pipe (DWC), non-metallic, Resistance to Compression : Type 450, Resistance to Impact: Normal, Resistance to Bending : Pliable, Resistance to External Influence: Ingress Protection : IP 67, Resistance against Corrosion : Without Protection, Resistance to Flame Propagation : Non Flame Propagating, Nominal outside diameter 90 mm, minimum inside dia 37 mm conforming to IS 16205 (Part 24) : 2017 complete all as specified and as directed.
AUGMENTATION OF WATER SUPPLY SYSTEM AND PROVISION OF FIRE STORAGE TANK AT NAV BHAVAN & EXCHANGE BUILDING, BALLARD ESTATE, MUMBAI - 400001.
Annual repair of civil works , water supply and Housekeeping services for Sadhbhavana colony Under Silewara Sub Area (For 02 Years)
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 75 mm diameter