9,661 results • Best match
PLEASE REFER TO BOQ
Earthwork in excavation by manual means in trenches for a foundation, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil.
Operation Maintenance of CI /DI / HDPE / UPVC / AC /GI Rising Main Distribution System for Bodai Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte.
Supplying, laying, fiting, fixing and jointing of UPVC pipes onforming to IS:4985-2000 with latest revision and amendments, if any, with ecessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing elephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as pplicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good uality/approved brand solvent cement (as per IS:14182-1994 cluding cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as equired at site by adopting suitable method so as to facilate the aintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with istribution pipes etc. all complete as per drawing direction and atisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to beproduced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate ofentire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (PHED SOR 2019, P-L.3-5, It-2(ii) ) (A) Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials butexcluding cost of valves.
Repairing and Modification of Gaseous chlorination arrangement at WTP of Sub Surface water based piped water supply scheme at Tapan Western Sector in the district of Dakshin Dinajpur under Malda Mechanical Division P.H.E.Dte.
Fitting fixing of the above new supplied spares on the existing position part by part with new ejector pipe line with necessary fitting materials and necessary welding job by expert mechanical complete the job as per direction of EIC and as per IS:1055
Permanent Restoration/Construction of Protection Work at spots and Providing Laying and Fixing of G.I Pipes in Gravity main, Sub main and Distribution Systems of various Water Supply Schemes WSS Pul Doda, WSS Old Trown, WSS Jangalwar, WSS Pranoo, W
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (new work) 40 mm nominal bore.
Augmentation of Piped Water Supply Scheme of Village Morija GP Morija for providing functional household tap connections under JJM, Tehsil Chomu, District Jaipur
Survey by Electronic Total station/DGPS of villages with a view of preparing "village index plan "indicating roads/ streets, surface and width of road/ streets along with places of importance such as Panchayat Bhawan, Hospital, School, Post office, Temple Water Supply structures (GLRs, PSPs, pumping station physical boundary of village north etc. including levels at some important points as per instruction of engineer in charge. Hydraulic Design of Distribution network in Loop/Water Gem/EPANET or any other compatible software. Preparation of Auto CAD Drawing (A-3/A-2) with complete hydraulic design out put details, such as pipe no, node no, pipe length, pressure at node etc. Submission of three sets of colour print prepared in Auto CAD. For Length Up to 2.5 KM
REPAIR/ MAINT OF EXTERNAL WATER SUPPLY PIPE LINES, REPAIR TO VALVE CHAMBERS, PUMP SET, REPAIR AND MAINT OF SWIMMING POOL, SUPPLY OF CHEMICAL, DE-WATERING, CLEANING AT PTS UNIT OLD AND NEW CAMP AREA SARSAWA UNDER GE (AF) SARSAWA
S & F of automatic pressure booster pump set of capacity 2 HP suitable for domestic water supply system for maintaining constant water pressure at taps and sanitary fixtures in residential buildings, operating on 230 volts, single phase, 50 Hz AC supply, comprising centrifugal/self-priming pressure pump with copper wound motor, pressure tank, pressure switch, non return valve, dry run protection, anti vibration mounting arrangement and automatic cut-in/cut-out operation including suitable control panel, flexible connections, foundation bolts, connection to existing water supply line and testing complete all as specified and directed. Make: Crompton/KSB/Kriloskar