Loading…
Loading…
9,347 results • Best match
CONSTRUCTION OF PRIMARY HEALTH CENTER(PHC) MIDMIDA AT BLOCK-PUSSORE, DISTRICT-RAIGARH (C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
Water Supply Scheme for Augmentation of UWSS Nadbai, Distt. Bharatpur including 5 year OnM after 1 year Defect Liability period under Amrut 2.0
Providing Household Tap Connection as per technical specification and approved drawing as per relevant IS code (amended up to date) from uPVC/DI/AC/MS/GI pipe line up to consumer meter/premises by using PP/MS saddle piece (Complete job).This job includes digging out suitable size of pits and trench for laying service line in all kinds of soil (excluding road); depositing and refilling of pit & jhiri with watering & ramming /compacting in layers and disposal of surplus excavated soil as directed with in a lead of 100 meter ; providing & fixing of all fitting duly approved in accordance with specification for potable water including MS/PP saddle piece, gunmetal ferrule 4.0 mm , GM Full-way Valve (IS:778 Mark) or ball valve (min. weight 165 gm) and specials, below ground level 20 mm nominal dia MDPE pipe PE 80 PN 16 as per ISO 4427 / 20 mm nominal dia PPR-C (Three layered) pipe PN16 SDR 7.4 (IS:15801:2008) (ISI mark) and above ground level using 20 mm dia PPR-C pipe with standard PPR fittings/ 15 mm dia GI pipe with fittings in the premises for fixing a tap / meter box (excluding) ,including accessories with flushing, cleaning, disinfecting and testing of pipe line complete required for making of service connection complete in all respect including labour charges . The service line should be laid at least 45 cm below ground level. Note: Road cut and restoration is not part of this item and paid separately.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS Vishwast; E-233 01 in no 40 TPH submersible pump not developing sufficient pressure Same to be overhauled and proved for satisfactory operation; Service Provider, ... sea water leakage ... fresh water pipeline ... water pipeline on ... view pipeline ruptured ... Defective pipeline and..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS Vishwast; E-298 Leakage observed from fresh water pipeline on boat deck view pipeline ruptured and uprooting non holding of one no cock valve Defective pipeline and..
Reparing and Maintenance work of Existing Piped water supply scheme at Varrious Villages in District Dindori and Village Ghusiya mal, Block- Dindori District Dindori. (Work execution as per Committee recommendation to be completed per job.)
Reparing and Maintenance work of Existing Piped water supply scheme at Varrious Villages in District Dindori and Village Ghusiya mal, Block- Dindori District Dindori. (Work execution as per Committee recommendation to be completed per job.)
Day to Day Operation and Maintenance of Water Supply Distribution System majority based on DI Pipe within Zone IV under Balurghat Municipality for the Period of 24 months
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. b) 90mm (OD)
Day to Day Operation and Maintenance of Water Supply Distribution System majority based on DI Pipe within Zone III under Balurghat Municipality for the Period of 24 months
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. b) 90mm (OD)