Loading…
Loading…
9,272 results • Best match
Supply (on hire charge basis), installation, operation , look after during monsoon period of 01 no., 26HP diesel operated surface dewatering pump including the supply of POL with the incidental charges for pumping the storm/drainage water at Jagat
Cost of consumable including supply of POL for operation of Diesel driven pump of different capacity at different site. (26 HP pump)
REPAIR/MAINTENACE OF WATER SUPPLY ASSETS SUCH AS SUBMERSIBLE/, CENTRIFUGAL /MONOBLOCK PUMP SET, SUBMERSIBLE CABLE AND CONNECTED ACCESSORIES IN PUMPING INSTALLATION AT AYODHYA CANTT UNDER AGE(I) AYODHYA
Deployment of manpower / tools / machinery etc for disconnection of water supply & electric connection of submersible pump set of any size from existing system, taking out / Uplifting the submersible pump set from deep borewell, disconnected from lowering pipe line of any size with manual or suitable electric driven chain pully upto 240 feet depth, dismentling of all flange joint of coloumn pipe, reassembling after neccesary repair, flange joiting of coloumn pipe, re-lowering the pump set in same borewell re-connection of complete all as specified and directed Note:- (i) Repairing / replacement of spare part of pump set / pipe will be paid separately. (ii) All type of T/P required to complete the job will be arranged by contractor. (iii) Items required for motor connection such as PVC insulation tape, tie rod, valcanised rubber / puncture tube etc will be provided by the contarctor to complete the work and rate as deemed to be quoted in unit rate no extra payment will be made to the contractor. (iv) Not / bolt / rubber gasket if found unservicable will be measured & paid seperatly. (iii) Each Job shall be completed by the contractor within therty six hours failing which recovery @ Rs 200 / hour will be recover from contractor subjected to maximum of Rs 2000 per Job.
Construction of control room, boundary wall, approach road, water supply arrangement and other civil works at 33 KV S/S RIICO Toonga under AEN O and M Banskho.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. (Concealed work including cutting chases and making good the walls etc.,) (A) 20mm nominal size. (2.38.2)
Construction of control room, boundary wall, approach road, water supply arrangement and other civil works at 33 KV S/S RIICO Tholai under AEN O and M Andhi.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. (Concealed work including cutting chases and making good the walls etc.,) (A) 20mm nominal size. (2.38.2)
CA NO. GE AF NO.1 / GUR-38 / 2026-27 REPAIR/ MAINTENANCE OF EXTERNAL WATER SUPPLY, FIRE FIGHTING SYSTEM, FIRE ALARM AND OTHER CONNECTED WORKS IN SEKHON VIHAR UNDER GE (AF) GURGAON NO.01
M&L for rectification of leakage from 80 mm size bore GI pipe line by cutting and removing old lengh of pipe, supply & fix new new galvanised iron pipe 80 mm bore medium grade pipe for stopping the leakage by making welding/replacemnt of necessary fittings of the same after drain out water from pipeline including insertion of pipe length upto 01 RM complete all as specifed and as directed by Engineer-in-charge.
Survey, Investigation and designing (Hydrographic, Hydraulic, Structural etc.) of Construction of RCC Strom Water Drain from TrishoolChauraha to Nakatiya River on Pilibhit Bypass Road, Bareilly.including supply of all material,labour, TandP etc.
Survey, Investigation and designing (Hydrographic, Hydraulic, Structural etc.) of Construction of RCC Strom Water Drain from TrishoolChauraha to Nakatiya River on Pilibhit Bypass Road, Bareilly.including supply of all material,labour, T&P etc. complete in all respect required for proper construction, completion of project and including 12 Months trial- run period with supply of manpower, T&P, transportation, water supply, power supply and fuel charges etc.