Loading…
Loading…
9,268 results • Best match
ANNUAL ITEM RATE CONTRACT FOR MAINTENANCE OF CI AND GI PIPE LINES FOR ENSURING UNINTRRUPTED WATER SUPPLY TO VARIOUS CHEMICAL PLANT INSIDE FACTORY AT O.F.BHANDARA
Labour only for Screwing existing steel tubing for alterations or additions(or lengthening screw on pipe to form connector) Bore of pipe 15 mm.
Supply and delivery of Compact Photometer along with Reagents for Nitrite testings of water quality testings in Vizianagaram Municipal Corporation. Est Cost Rs.2.20 Lakhs.
Construction of Approach Road to Student Welfare Centre, Paver Block Parking and shifting of Water Supply line in North Campus at MBM University, Jodhpur (MBM2627WSOB00021)
Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5].Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 100% of maximum dry density (Modify Heavy Proctor test).excluding watering.
SPL REPAIR REPLACEMENT OF PINE LINES AND CONNECTED WORK AT SU AND WATER SUPPLY LINES AT RMU AT AF STN BAMRAULI UNDER GE AF BAMRAULI
Supply & laying in trenches ductile iron (DI) pipe with spigot and socketed ends centrifugally cast class 'K-7' in any length laid in trenches, complete all as specified and directed for the following sizes/bore of pipes (DI fittings and jointing materials shall be measured and paid separately) :- (a) 150mm bore dia
Supply and Laying of Storm Water Line and Construction of Disposal Tank in Community Center near shahid Park Boosting Ward No. 05, NIT Faridabad (Recall)
Supplying , lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-9 grade 300mm dia pipes as per 15:8329-2000, with internal cement mortar lining for potable water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/W to be measured and paid separately.
Augmentation work of Boundary wall, Pump House and Construction Pathway Approach Road at Head Work Site of JATRADANGA Water Supply Scheme of Old Malda Block under Malda Division, P.H.E.Dte. in the District of Malda. (2nd Call)
Augmentation work of Boundary wall, Pump House and Construction Pathway & Approach Road at Head Work Site of JATRADANGA Water Supply Scheme of Old Malda Block under Malda Division, P.H.E.Dte. in the District of Malda.