Loading…
Loading…
9,124 results • Best match
Comprehensive Maintenance Contract of the existing STP, WTP, Water Supply System (WSS), RO Plant and Borewell (including consumables, spare parts etc.) for Islampur Super Speciality Hospital under the jurisdiction of WBMSCL for a period of 1 year
Comprehensive Operation & Maintenance (including man power, all Consumables, Spare Parts, SITC of any type of pumps for replace the old pumps & Accessories) for the Water Treatment Plant including the Treated Water Supply System from underground reservoir to all overhead tanks at Islampur Super Speciality Hospital
Annual Plan-2025-26-Wadakkanchery B.P - Borewell pump set and water supply to chc erumappetty and chc erumappetty quarters - Erumappetty G.P -Project No S0 120/26 -General Electrical Work
90.12.10.2:Supply & laying of DWC pipe in ordinary soil 0.75m below ground level including excavation50/38 mm or nearest size
Tender for the work of Augmentation of Water Supply Scheme Chatiwind Block Attari Amritsar under NABARAD XXXI drilling of 550 dia bore with reverse rotary rig upto 165 Mtr depth BGL 300 KL Capacity OHSR having height 23 50 Mtr etc
Bid Document of Augmentation of Water Supply Scheme Chatiwind, Block Attari, Amritsar (Under NABARD XXXI) Drilling of 550 MM dia bore with reverse rotary rig upto 165 Mtr depth BGL, 300 KL Capacity OHSR having height 23.50 Mtr. upto FSL & 23.50 Mtr upto sill level, Rising main, Distribution System, Water Connections, Water Meters, Chlorinator, Pumping machinery, Development of water works site, Solar Panel, Pump chamber with WC etc. .
CONSTRUCTION OF BALANCE WORK OF URBAN HEALTH & WELLNESS CENTER (U-HWC) AT PARSHAD OFFICE, DISTRICT-RAIPUR(C.G.) i/c INTERNAL WATER SUPPLY, SANITARY FITTING, ELECTRIFICATION WORK ETC.
Construction of Swewrage Treatment Plant, Main Pumpinfg Station, Intermediate Pumping Station, Layaing Of Sewer Line and Construction of M.H. Detailed Project Report for upgradation of existing water supply scheme in village Kushak ,Accheja, Bhawana
Operation and Maintenance (O and M)-cum-Defect Liability Period (DLP) for a period of 06 years after successful completion of trial run, covering all assets under the DNIT including Existing water supply infrastructures of the village Kushak i.e tubewells,UGTs, pumping machinery, water supply network, IPS,MPS, STP, all water works, lawns and horticulture areas, all civil structures, mechanical systems, electrical installations, instrumentation, PLC and SCADA systems, transformer, DG sets, control panels and all allied works: the scope includes deployment of skilled manpower, operation of pumps and treatment units, routine and preventive maintenance as per relevant standards, chlorination of water supply system as well as chlorination/disinfection of treated effluent, operation of STP with required chemical dosing and treatment processes, maintaining prescribed water quality and effluent discharge standards, upkeep of lawns and horticulture provision of all consumables and chemicals, ensuring uninterrupted services, and rectification or replacement of any defects during the O and M/DLP period, with all systems to be maintained in sound and efficient working condition throughout. Note: 1. The contractor shall quote rates for O and M for the entire project, inclusive of all components and activities specified above. 2. The O and M will be charged to Annual maintenance
Augmentation of Water Supply System by Providing and Installing new Tubewells Construction of UGSR Distribution Network and Tap Connection at Naya Gaon SAS Nagar Punjab Under AMRUT 2.0