Loading…
Loading…
9,139 results • Best match
Construction of Swewrage Treatment Plant, Main Pumpinfg Station, Intermediate Pumping Station, Layaing Of Sewer Line and Construction of M.H. Detailed Project Report for upgradation of existing water supply scheme in village Kushak ,Accheja, Bhawana
Operation and Maintenance (O and M)-cum-Defect Liability Period (DLP) for a period of 06 years after successful completion of trial run, covering all assets under the DNIT including Existing water supply infrastructures of the village Kushak i.e tubewells,UGTs, pumping machinery, water supply network, IPS,MPS, STP, all water works, lawns and horticulture areas, all civil structures, mechanical systems, electrical installations, instrumentation, PLC and SCADA systems, transformer, DG sets, control panels and all allied works: the scope includes deployment of skilled manpower, operation of pumps and treatment units, routine and preventive maintenance as per relevant standards, chlorination of water supply system as well as chlorination/disinfection of treated effluent, operation of STP with required chemical dosing and treatment processes, maintaining prescribed water quality and effluent discharge standards, upkeep of lawns and horticulture provision of all consumables and chemicals, ensuring uninterrupted services, and rectification or replacement of any defects during the O and M/DLP period, with all systems to be maintained in sound and efficient working condition throughout. Note: 1. The contractor shall quote rates for O and M for the entire project, inclusive of all components and activities specified above. 2. The O and M will be charged to Annual maintenance
Augmentation of Water Supply System by Providing and Installing new Tubewells Construction of UGSR Distribution Network and Tap Connection at Naya Gaon SAS Nagar Punjab Under AMRUT 2.0
Maintenance and Repairs to water supply lines in centenary colony, RG-III area.("Invited under earmarked works-SCCL registered contractors belong to ST community are eligible to participate").
Construction of Boundary Wall at Head Work site of Dilalbati Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
Filling in foundation or plinth by fine sand in layers not exceeding 150mm as directed and consolidating same by thorough saturation with water ramming complete. Including the cost of supply of sand.( Payment to be made on measurment of finished quantity )
Extension of part of the First floor of office building including brick masonry, MS structural framework with puf sheet roofing including water supply, drainage and internal electrical installation
Provision of Two No. Dug wells along with laying of lines and allied works to augment the source of water supply to IIT Jammu Campus under (Deposit contribution work)
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. (to be paid as per the log book maintained at site during construction)