Loading…
Loading…
9,180 results • Best match
Maintenance of nursery stocks by Deweeding/Cleaning of polybags, berms, paths and beds, Supply/Appling of Urea, Regular watering and cleaning of water channels, Spraying of fungicide/pesticides and Recouping of the failed polybags at Sirch Nursery
Fungicide ( 1 Kg of mancozeb in 150 Litres of water = 15 beds)
Maintenance of nursery stocks by Deweeding/Cleaning of polybags, berms, paths and beds, Supply/Appling of Urea, Regular watering and cleaning of water channels, Spraying of fungicide/pesticides and Recouping of the failed polybags at Sonwar Nursery
Fungicide ( 1 Kg of mancozeb in 150 Litres of water = 15 beds)
4 No. Repair of old OHSR 68 75 95 and 136 cum CONSTRUCTION OF 1 NO. NEW PUMP CHAMBER 6.10 M X 4.88 M 2 NO. REPAIR OF OLD PUMP CHAMBER 6.10M X 4.88M DISTRIBUTION SYSTEM SITE LAYING CARRIAGE OF MATERIALS
"4 No. Repair of old OHSR (68, 75, 95 and 136 cum ), CONSTRUCTION OF 1 NO. NEW PUMP CHAMBER 6.10 M X 4.88 M, 2 NO. REPAIR OF OLD PUMP CHAMBER 6.10M X 4.88M, DISTRIBUTION SYSTEM, SITE LAYING, CARRIAGE OF MATERIALS, PROVIDING AND FIXING OF NEW HOUSEHOLD CONNECTIONS & REPAIR OF EXISTING HOUSEHOLD CONNECTIONS COMPLETE IN ALL RESPECT AND ALL OTHER WORKS CONTGENT THERE TO".
Sinking of Big Dia. Tube well, Inter connection beteween TW Existing Pipe line, Construction of Pump House of BETAHAL Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Formation of Industrial Layout, including Construction of Roads, RCC Side Drains, Cross Drainages, Retaining Wall & HDPE Dual Water supply pipe line at Sector-1 in Dobaspet Industrial Area, 7th Phase, Nelamangala Taluk, Bengaluru Rural District.
Formation of Industrial Layout, including Construction of Roads, RCC Side Drains, Cross Drainages, Retaining Wall & HDPE Dual Water supply pipe line at Sector-1 in Dobaspet Industrial Area, 7th Phase, Nelamangala Taluk, Bengaluru Rural District.
Construction of Science Building (G plus 4 storied) at MBB College Agartala Tripura_ Vertical extension from First Floor to Fourth Floor on existing Ground floor _SH_ Building portion including internal water supply, sanitary installation, sewage,
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. - Internal work - Exposed on wall