Loading…
Loading…
9,178 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - HURL Barauni Township; Design and supply of Water pre-treatment Plant of 30 cubic meter per hour Capacity (2 nos) at HURL Barauni Township; As per scope of work
and Installation of Plant Systems/Equipments (Version 2) - HURL Barauni Township; Design and supply of Water pre-treatment Plant of 30 cubic meter per hour Capacity (2 nos) at HURL Barauni Township; As per scope of work
REPAIRING OF WATER SUPPLY MAINS,HSC,FITTINGS AND ALLIED WORKS NEAR 170,227 NASKAR PARA ROAD,27,63/A JUDGE BAGAN,130/1/2,79/1 M.G.ROAD, MUCHIPARA HARISAVA MANDIR, B.P.ROAD ETC. FOR EXECUTION OF SANDD WORK IN WARD NO-115, BR-XIII.
CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.7 Cutting of C.l/D.I pipes for fitting with pipes and-or specials of similar or dissimilar materials at the time of laying without damaging any part of the required length including taking out of the broken pieces from the trench and restacking the same at the specified location as per direction of the Engineer-in-Charge.D iameter in mm 100mm dia.
Shifting of 400 mm i/d water supply line at Jwalla mill booster and making of 2 nos 400 mm i/d connection including all charges complete in all respect to satisfaction of Engineer in charge.
Making connection in running master water supply line and 400 mm to 400 mm i/d CI/DI/MS-CI/DI/MS using Specials and Mechanical Joint Collar including lifting and shifting of items using crane, Dewatering, DG charges and all other charges as per site requirement complete in all respect with satisfaction of Engineer in charge. (Cost of Specials and MJ Collar will paid separately) Connection in 400mm line
I. Operation & Maintainance of ward level piped water supply schemes (Q affected/PWS) by deploying pump operators and payment of electricity charges and II. Comprehensive maintenance of Ward level water supply schemes (Q affected) i/c the cost of chemicals, cleaning of ESR and campus, maintenance viz. cleaning &painting of pump house, boundary wall, repair of leakages in distribuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electro-mechanical components etc. all complete as per the directions of Engineer-in-charge.
1 I. Operation & Maintainance of ward level piped water supply schemes (Q affected/PWS) by deploying pump operators and payment of electricity charges and II. Comprehensive maintenance of Ward level water supply schemes (Q affected) i/c the cost of chemicals, cleaning of ESR and campus, maintenance viz. cleaning &painting of pump house, boundary wall, repair of leakages in distribuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electro-mechanical components etc. all complete as per the directions of Engineer-in-charge. i.) Rural Piped Water Supply Scheme 03 (PWS ), ii.) Ward level Piped Water Supply Schemes 1004 in quality affected wards (WLS_Quality) 11580.919
Supply, and Installation of Prefabricated Single Storey Portable Office inclduing Toilet and UV UF Water Doctor uv plus 6th WatercumPurifier at Race course in ward no.66 Central Zone,Coimbatore Corporation
Supplying and erecting in position of following liters capacity Industrial UV+UF Water Doctor uv plus 6th Water-cum- Purifier to deliver Potable Water with World Health Organisation (WHO) Standards with following accessories.20 - 25 Litres capacity
SSE (W) Akola Jurisdiction - Proposal for Provision of Heavy repairs to Platform surface , Drainage system, water supply, Cover shed of Service building and Platform at Akola railway station.(Rev : 2026-27)
12.37S RAIN WATER SPOUT AND PIPE