Loading…
Loading…
8,876 results • Best match
CONSTRUCTION OF 1918 UNITS HAVING 35 SQ.MT. CARPTE AREA EWS HOUSES INCLUDING INTERNAL INFRASTRUCTURE & DEVELOPMENT WORK AT THE PLOT AT TP.75 (MUTHIYA-HANSPURA) FP.87 IN NORTH ZONE OF AHMEDABAD CITY
electrification, water supply, drainage, storm water
PROVISION OF SINGLE LIVING ACCN ALONGWITH ATTACHED TOILET FOR 24 JCOS FURNITURE AND ALLIED ACCESSORIES AT CHUSHUL COY IN AEC TRAINING COLLAGE AND CENTRAL PACHMARHI
Sch 'A' Part-XI (Hot Water Supply & Solar Hot Water) Lump sum price worked out by the contractor for (Hot Water Supply & Solar Hot Water) as listed in Schedule 'A' Part-XI against the lump sum price inserted by the MES.
PROVN OF AUDITORIUM AT NASIRABAD MIL STN
INTERNAL WATER SUPPLY WORKS NOTE:- For items of INTERNAL WATER SUPPLY WORKS notes given at the beginning of Sch ‘A’ Part-II (INTERNAL WATER SUPPLY WORKS) shall also be applicable.
PROVISION OF INLIVING ACCOMMODATION WITH ASSOCIATE FACILITIES FOR ONE FULL DSC PLATOON AT 4N DETACHMENT RAMESWARAM
Labour charges for Cutting existing water pipeline of dia 40 or 50 mm for alterations or additions done in position without taking down and Screwing existing waterpipeline of dia 40 or 50 mm for alterations or additions (or lengthening screw on pipe to form connector)
Construction and Installation of AIRP (Arsenic and Iron Removal Plant) including necessary Design, Engineering, Structural and Hydraulic details, Proper sizing, supply, construction, erection and commissioning including all arrangements of Oxidation,
... including necessary Design, Engineering, Structural & Hydraulic details, Proper sizing, supply, construction, erection and commissioning including all arrangements of Oxidation, Filter ...
Track excavation and curb stone work in L.B.S. College
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.