Loading…
Loading…
8,853 results • Best match
Asansol Division: Provision of Automatic block signalling in Andal- Sitarampur section on HDN route of Howrah-Delhi(Phase-II).(Balance Work)
Price for supply of GI pipe 50 mm dia. medium gauge & cable trenching laying through GI pipe for track / road / drain crossing.
REPAIR RENEWAL MAINTENANCE OF CI DI PIPE LINES OF VARIOUS SIZES ALONGWITH CONNECTED ACCESSORIES AT VARIOUS LOCATIONS IN RAJBARI AREA AND IN RMS
Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5m in depth for laying of water supply pipe line etc area not exceeding 10 Sqm on plan and getting out soft/loose soil complete all as specified and directed. Note : -Excvation to be done through manual only due to site condition.
Beautification work of Aggersain Chowk (Rohtak Gate) Bhiwani.
Supply, installation, testing and commissioning Fountain including all accessories, Electrical and Water Supply installation complete in all respect
Balance work under JJM at Village Pagra Block Gunnor based on TW. i.c pipeline etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Balance work for Piped Water Supply Scheme under Jal Jeevan Mission at Village – Pagra Block Gunnor district Panna based on Tube well including installation of electric submersible water motor pump and distribution pipe line system, household tap connections, installation of ready made mini pump house and ...
Upgradation of Indrapuram Crossing to Ekta Police Chowki Road Development under CM-GRID 3RD CALL
... 0.80 ltr/10 sqm of approved brand and manufactureäõ,eBarricading work for laying of sewer line including all required material, labour, T&P etc. complete.®Dismantling of BT road for laying of sewer line including stacking of dismantled materials as directed by Engineer Incharge ...
PROVN OF OTM ACCN AGNIVEER AT ARMY AIR DEFENCE CENTRE GOPALPUR
Sch 'A' Part-VIII (Hot water supply & Solar Hot water) Lump sum price worked out by the contractor for (Hot water supply & Solar Hot water) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES.