Loading…
Loading…
8,853 results • Best match
REPAIR/ REPLACEMENT OF UNSERVIVEABLE CI/DI/GI PIPE LINE, SLUICE VALVE, VALVE PIT CHAMBER AND CONNECTED ITEMS AT SOUTH AREA UNDER GE (U) MEERUT.
Day to day maintenance/repair/rectification of water supply complaints against any kind of fault in water pipe line of any size and type or No water supply complaint from building mounted OHT or any other complaint all as directed time to time ...
SPECIAL REPAIRS TO INDOOR ELECTRIC METER PANEL OF BLDG P-41, P-42, P-44 TO P-52, P-56 AND C1-P-06 TO C1-P-10 AT LITTLE BINAGA AND P-29 TO P-31 AT KAMAT BAY, NAVAL BASE KARWAR AND SPECIAL REPAIRS OF OVERHEAD TANKS AND DISTRIBUTION LINE OF FRESH WATER
Supply and laying of UPVC pipe with all fittings for connection of pipe on walls/ ceilings/ floors/ trench complete all as directed & specified for the following sizes :-
Balance work under JJM at Village Barsobha and Bamhori Block Gunno based on TW. i.c pipeline, Sump well etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Balance work for Piped Water Supply Scheme under Jal Jeevan Mission at Village – Barsobha & Bamhori Block Gunnor district Panna based on Tube well including installation of electric submersible water motor pump and distribution pipe line system, Sump Well, household tap connections, installation ...
WORKS
Pipe Line Laying work in ward no 01, Various Lanes of Mohalla Bhoodwala Nagar panchayat Bugrasi.
REPAIRS REPLACEMENT MAINTENANCE TO DI GI CI PIPE LINES FITTINGS PUMPING SETS SERVICING OF WATER TREATMENT PLANT UG TANKS CLEANING AND CONNECTED WORKS AT CABS STIR AND CEMILAC UNDER GE I RAND D EAST BANGALORE
Material and labour for complete painting of inlet water supply pipe line and delivery pipe line including motor pump/ foundation at fire fighting pump / water supply pump house as per approved colour by Engineer-in-Charge complete all as specified and as directed.
Maintenance and repair work of Bus Stand Building and other Municipal Building in Deogarh
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 15 mm dia