Loading…
Loading…
8,850 results • Best match
Construction of Market Shed With Toilet Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Silli Bazar, Ranchi
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal Work - Exposed on Wall
Construction of Market Shed With Toilet, Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Mandar Bazartand, Ranchi
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal Work - Exposed on Wall
Construction of Market Shed With Toilet, Deep Boring, PCC Road And Solar Light In The Campus Of Agriculture Market, Sonahatu Bazar, Ranchi
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal Work - Exposed on Wall
Operation and Maintenance of CPWS Scheme to Maheswarapuram and 5 other Habitations of Eluru Mandal for the Year 2026-27, Est Cost Rs.22.00 Lakhs.
Operation and Maintenance of Multi Village Scheme for Supply of potable (chlorinated) drinking water at the specified quantity as per drinking water quality standards to all the habitations mentioned in the schedule through the existing ...
Construction of Nala Trilok Ji Sharma (Patwari) to Khinchi Ji house in Ward No. 28.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction of Drain Govind Singh Ji house to Trilok Ji Sharma house in Ward No. 28.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...