Loading…
Loading…
8,851 results • Best match
Grey water Management Project 2025-26 -DEWATS Savithri Bhai Asram School, Bedadukka - Kasaragod dist.
100.9.5 Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 50 mm nominal outside diameter pipes.
WORD NO.17/10 ME MAU AZAMGADH ROAD KE KINARE MATALUPUR BANORA MODH KE PASS ASHOK KUMAR SINGH KE MAKAN KE PASS SE PQURAGHAT WALE ROAD PER SURENDR RAI, ACHAY PAN KI GOMATI KE PASS TAK PIPE LINE VISTAR KA KARYA
Laying of PVC Pipe 160 mm
At TSK Division- Extension of PF No. 1 by 220 m at LLO and PF No. 2 by 200 m at MJN in connection with ABSS.
18.0 WATER SUPPLY
PROVN OF GD ROOM WITH TOILET AND STORE ROOM AND PROVN OF NIGHT PICKET GUARD ROOM WITH TOILET AND BATHROOM AND ALL CONNECTED SERVICES AT MIL STN JAMMU UNDER GE SATWARI
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part-II
Setting up of Infrastructure for Linen Management Facilities at LKO Coaching Depot NR.
Plumbing Jobs- Water Pipelines, Steam condensate return pipeline, Compressed air line & Insulation of steam & condensate pipelines, etc. Above/
Provision of Relay Hut at (18 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) in the jurisdiction of DEN-HQ/FZR as per Type Plan No. HQ/01/02-2017/R-1.
... quality and colour, weighing not less than 300 gms. Total 270673.20 Item- 12 CODE-18 WATER SUPPLY S No. Item No Description of Item Unit Qty Rate Amount 18.0 WATER SUPPLY 18.1S PE-AL-PE COMPOSITE PRESSURE PIPE Providing and fixing Polyethelene-Aluminium- Polyethelene PE-AL-PE Composite Pressure ...