Loading…
Loading…
9,955 results • Best match
Maintenance of RWS schemes at Amarpur under Gomati District Tripura/SH-Maintenance of water supply schemes in/c. maintenance of PVC, CI, DI and GI pipeline, washing of pipeline, fitting fixing of sluice valves, tyton collars, electrical equipments et
Clearing of deposited iron in side of laying CI pipe line in different dia (80/100/125/150 mm dia) and dismantaling old CI pipe in/c trenching , refilling etc. for 100 mtr lead pipe line of required width and depth cutting earth in 25 mtr distance and 12.00 mtr long in each i.e. 36 mtr trenches cutting for every 100 mtr pipe iron through UPVC coil pipe after clearing , washing, laying the same with rubber gasket , pipe lead joints as per direction of Engineer - in - charge ( pig lead will be issued by the dept. at free of cost and rubber gasket and T & P arrange by the agency).
Laying D.I. house Pipe Line in Master Colony from Shiv Mandir to H/o paras ji and house to house Connection at Ward No. 70 (RE-TENDER)
Laying D.I. house Pipe Line in Master Colony from Shiv Mandir to H/o paras ji and house to house Connection at Ward No. 70 (RE-TENDER)
Providing Laying 300mm Dia Distribution Main Pipe Line From Milk Scheme OHT to Nirbhay Nagar Jabalpur, Neta ji Subhash Chandra bose ward zone 7.
Providing Laying 300mm Dia Distribution Main Pipe Line From Milk Scheme OHT to Nirbhay Nagar Jabalpur, Neta ji Subhash Chandra bose ward zone 7.
Construction of Pump House, Sinking of Big Dia. Tube well, Inter connection, Laying of Parallel/ Dedicated Pipeline and FHTC of JAGANNATHPUR Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt.
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as Intake wells/structures, HGLR, Sump, Presser Filter Plant , Staff quarters, Pump house, all Bulk Transmission and Distribution pipelines, valves, pumping machinery & ... Regional Water Supply ... Water Supply Scheme, ... including supply of ... potable water to ... excluding supply of ... & Water and
the Jamanyamal Regional Water Supply Scheme, including supply of 0.32 MLD potable water to all
Laying of SW Pipe Drain from K.Krishna(H) to M.Gopal (H) at Ward No.14 in Dabilpur area in Yellampet Municipality under Municipal General Funds