Loading…
Loading…
9,959 results • Best match
Construction of Pump House, Sinking of Big Dia. Tube well, Inter connection, Laying of Parallel/ Dedicated Pipeline and FHTC of JAGANNATHPUR Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt.
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Maintenance of RWS schemes at Amarpur under Gomati District Tripura/SH-Maintenance of water supply schemes in/c. extension and maintenance of PVC, CI, DI and GI pipeline, washing of pipeline, fitting fixing of sluice valves, tyton collars, hydrant po
Clearing of deposited iron in side of laying CI pipe line in different dia (80/100/125/150 mm dia) and dismantaling old CI pipe in/c trenching , refilling etc. for 100 mtr lead pipe line of required width and depth cutting earth in 25 mtr distance and 12.00 mtr long in each i.e. 36 mtr trenches cutting for every 100 mtr pipe iron through UPVC coil pipe after clearing , washing, laying the same with rubber gasket , pipe lead joints as per direction of Engineer - in - charge ( pig lead will be issued by the dept. at free of cost and rubber gasket and T & P arrange by the agency).
Work of Providing laying 1016mm dia MS water supply pipeline from Sri Chitanya Techno School to Sri Vishnu Leela Hotel along Chikkanahlli main road to improve the water supply distribution from cuavery stage V Haddosiddapura(Doddakanhalli) 48ML GLR to 110 villages of GBA area coming under Bommanahalli and Mahadevapura zone, BWSSB
Work of Providing laying 1016mm dia MS water supply pipeline from Sri Chitanya Techno School to Sri Vishnu Leela Hotel along Chikkanahlli main road to improve the water supply distribution from cuavery stage V Haddosiddapura(Doddakanhalli) 48ML GLR to 110 villages of GBA area coming under Bommanahalli and Mahadevapura zone, BWSSB
Additional work for laying of pipe line ( left out) with HDPE pipe line with FHTC within command area of Lohar para , Ghorui para,Badyakar Para ,Dighir para, Bagdi para, under Kanksa Zone-I PWSS with reconnection of esisting FHTC and other allied wor
Additional work for laying of pipe line ( left out) with HDPE pipe line with FHTC within command area of Lohar para , Ghorui para,Badyakar Para ,Dighir para, Bagdi para, under Kanksa Zone-I PWSS with reconnection of esisting FHTC and other allied works of Augmentaion of Kanks Zone-I PWSS under RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)
Laying of 110 mm dia PVC Pipe Line 160 Mtr From Sri Rajkumar House to h.no 66 a to 90 tak in Ward-29 Kanpur
Excavation of trenches manually or machanically in soil mixed with Moorum/shinle/kankar for pipe line with lift 1.5m lead upto 50m including filling bacjk watering and ramming of excavation earth in to the trenches and removeal and disposal of surplus earth within a distance of 50m from center of the excavated Trenches
Laying of 110 mm HDPE Pipe line From Dheerendra house to Babu house Mohalla Lohiyaan Ward no05 in the limit of Nagar Palika Parishad Dhampur
Laying and Jointing PVC Pipe. Heading