Loading…
Loading…
9,748 results • Best match
MOHALLA ASTUPURA ME DR. NEYAZ AHMAD SAHAB,MUMTAZ INTIRIYRS KE PASS SE ANAS ATOMOBILE, STAR TILES, ARVIND CHAURASIA, SHRIYA MOBLIE, HAJI FAKRUDDIN SAHAB KE MAKAN KE PASS TAK PIPE LINE VISTAR KA KARYA
Laying of PVC Pipe 110 mm
Construction of Multipurpose Sport Stadium at Pussoure. i/c W.S.S.F. Electrification & Approach Road Works.
Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 600 mm dia
Construction of Multipurpose Sport Stadium at Mahapalli. i/c W.S.S.F. Electrification & Approach Road Works.
Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 600 mm dia
DAY TO DAY MAINT OF OFFRS, JCOS AND OR OTM AND MD ACCN UNDER ZONE B OF GE AHMEDABAD
M&L for Attending complaints related to Plumbing/Water Supply and obtaining completion from user including minor repair of taps by replacement of washers,... tightening of taps, spindals of any size , tightening of check nuts, PVC connection and making water supply functional in case of blockage redressing of GI pipe joints if any leakage is found, repair of un-functional PVC flushing cistern, repair/replacement ...
CWE/AF AMB/AMB-T03/2026-27 PROVN OF BOREWELL IN TECH AREA AT AF STN AMBALA UNDER GE(AF) AMBALA
Supply and fixing glow sign board for water supply installation made out of GI sheet box frame with aluminium angla support front side transparent... including prewired with 2.5 sqmm two core copper wire, supported with light grade GI pipe 50mm dia of each leg 02 metre long complete all as specified and directed by Engineer-in-charge..
Construction of Multi Commodity Packhouse Part A Civil work including Supply and installation of Vapour Heat Treatment VHT unit with Integrated Packhouse and Irradiation Unit and scientific cold storage facilities Part B Plant and Machinery
Providing and laying concrete pipes of Indian standard Non pressure class of 150 mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete..