Loading…
Loading…
9,746 results • Best match
Arrangement of temporary drinking water through Departmental / hired vehicles to combat drought like situation at various locations within Joynagar-I and adjacent Blocks in Phase-II for the year 2026-2027 in the District of South 24-Parganas
Drinking water supply arrangement from the sources of GLR/ PWSS through Departmental PVC Tank of 1000 Ltr. Capacity by Hiring of Three-Wheeler Motor Van for delivering drinking water to and fro travelling to various water scarcity areas including cost of disinfection and cleaning of water tank, Diesel, Mobil, all other incidental charges and as per direction of EIC. [Rate inclusive of 18% GST]
Annual Operation and Maintenance of Submersible Pump Motor set installed at Ashokenagar State General Hospital at Ashokenagar in the District of North 24 Parganas
Day to day Operation and Maintenance of Pump Motor set and Controlling valves in water supply line in order to provide uninterrupted water spply at different building of Ashokenagar State General Hospital for any shift in a ...
Construction of Community Centre with electrification and all infrastructure works at Poddar Park Tenament Scheme Premises No. 420/1, P.A. Shah Road, Kolkata- 700045 under Housing Sector, KMDA
Supply & Construction of Manhole Type B (on existing/new sewer) up to a maximum invert depth... finish; over 15 mm thick plaster in cement mortar (1:3) in all internal faces; including supplying and fixing polypropylene coated foot-rests, conforming to ASTM D 4101 specification, ...
CONSTRUCTION OF EXAMINATION HALL FOR TRAINEES AT NO 2 TRAINING BATTALION OF AOC CENTRE UNDER GE(SOUTH) SECUNDERABAD.
EXTERNAL WATER SUPPLY Cutting existing steel tubing for alternations or additions and screwing existing steel tubing for alternations or addtions or lengthening screwd on pipe to from connector of 80 to 40mm complete all as specified and directed.
REPAIR/REPLACEMENT OF PUMP MOTOR OF VARIOUS SIZE AND VARIOUS TYPES STARTER AND MISC WORKS AT STN UNDER GE (AF) CHABUA
... enamel paint on surfaces of machineries, equipment, steel structure at sewage pump and water Supply pump installations etc complete all as specified and directed by Engr in charge. Note :- T&P installed at sewage well No 1 to 03 & Water supply pump house and connected items shall only be measured under this item.
INTEGRATED SOLID WASTE MANAGEMENT (SWM) PROJECT AT NABHA AND SANGRUR UNDER GE (S) PATIALA
Total amount of Sch 'A' Part-III (Internal Water Supply Works) lump sum price worked out by the contractor for "Internal Water Supply Works" as listed in Schedule 'A' Part-III.