Loading…
Loading…
9,854 results • Best match
Construction of infiltration well (2 nos) and providing submersible pumpset, starter, pumping main and cable at Cauvery river Parisal thurai headworks in Kulithalai municipality
Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the 250mm diametres of pipes.
PROVN OF MI ROOM FOR MIL STN MUZAFFARPUR
Sch 'A' Part-III (Internal Water Supply) Lump sum price worked out by the contractor for (Internal Water Supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES.
02 - Gulab ji ke Bhatte par Sunil Gwala ke makan se Keshuram Jaat ke makan tak Nali/Nala nirman and anya Repair karya Pratapgarh
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
nagar palika seema kshetre ke devi singh chhatri ke samne se hote huye aage ki or cc road nirman karya
... and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitablesite ...
Construction of Drain/Nala from Rajkunwar Singh Ji House to New Civil Line Main Road.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
WORK NO 15
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m