Loading…
Loading…
9,894 results • Best match
CONSTRUCTION OF PROPOSED SEWERAGE TREATMENT PLANT , LAYING OF SEWER LINES and CONSTRUCTION OF MAIN HOLE Drilling of Tubewells , Construction of Boosting Station , Laying of Rising Main , Internal Distribution System and Independent Feeder
... successful completion of trial run, covering all assets under the DNIT including Existing water supply infrastructures of the village Chandhut i.e tubewells, UGTs, pumping machinery, water supply network, IPS, MPS, STP, all water works, lawns and horticulture areas, all civil structures, ...
Construction of Park in Kenddih, Kapali Nagar Parishad, Kapali Seraikela-Kharsawan, Jharkhand
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall
PE LAYING AND ASSOCIATED WORKS FOR CITY GAS DISTRIBUTION PROJECT IN NAINITAL
90mm trenchless laying with — 90mm MDPE Pipe line laying by Trenchless Method, with casing (Including supply & installation of HDPE casing pipe)
Construction work for the Anganwadi center building at Kharcha, under the Pauli Child Development Project.
SUB HEAD-II-WATER SUPPLY. Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Supply Installation Erection and Commissioning of 5 HP Submersible Pump for Sewage application with Star Delta Starter Automating the operation of sewage pumps using Programmable Logic Controller and Piping arrangements at Vallalar nagar 6 ward no57
... with initial lead and lift as initial of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply works in Hard stiff clay, stiff black cotton, hard red earth shales, murram gravel, stoney... and hard gravel soil including refilling the sides of foundation in layer of 15m thick watering ramming depositing the surplus earth in the premises as directed by the departmental ...
Construction of HDPE Tank Pedstal Colum at Kamaraj Nagar and Supply of New 5.00 HP Submerscible Motor at Nethaji Nagar in Ward No.21
... with initial lead and lift as in initial of 10M and lift of 2M in narrow trenches for laying of Pipes for water supply work in hard stiff clay,stiff black cotton,hard red earth shales,murram gravel,stoney... and hard gravel soil including refilling the sides of foundation in layer of 15m thick watering ramming depositing the surplus earth in the premises as directed by the departmental ...