Loading…
Loading…
10,044 results • Best match
Repair and maintenance of busstand North side Drainage and Extension of Toilet in Sathyamangalam Municipality
Supplying, laying and jointing UPVC pipes of Class 5 32 mm(having working pressure of 10 kg/sq.cm) conforming to IS 4985- 2000... necessary scaffolding charges, etc., complete complying with standard specifications. The UPVC pipes shall be got approved by Executive Engineer before use on works. - Internal water supply - above ground level.
CONSTRUCTION OF BUILDING LESS SCHOOL UPS SHEIKH MOHALLA TEKIPORA.
Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes ...
Toliet Renovation at Computer Science Department in the University Premises
Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete.
Water Proofing Treatment and other Balance Work of Community Hall in Village Khera Dabar and Kharkhari Nahar, Dwarka Zone.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Development of Shiv Park in RK Puram Colony, Titardi. 2803
... Code [S-2.39 2022 + 2.39.1]: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings, this included jointing of pipes & ...
SPL REPAIR TO BLDG NO. T-12 APS-I AREA OF AGE B/R - I UNDER GE (EAST) LUCKNOW
Supply and fixing Digital storage water heater (Geyser) Square type of capacity 25 ltrs, 230 volts, power consumtion 230V, vertical... pressure,colour changing lights that change from blue to amber to indicate the hotness of water,automatic shut off including four nos of rag bolts and making the elctrical / water supply connection including testing after installation complete.