Loading…
Loading…
9,822 results • Best match
Construction of Type-A-03 Nos. and Type-B-23 Nos. Residential Building at Thana Junawai in District Sambhal.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step ...
Drilling Of Borewell And Pipe Lien Work In Near Kqalagi House And Near Mundaragi house At ward no 20.
Supply and delivery at site wrought middle steel (galvanized) GI hexagonal nipple confirming to IS 1239-II, 1991 with latest amendments if any. As Per CSR for Water Supply & Sewerage Works 2023-24 Pag...
Repairing of leakages / bursts and interconnection works of AC/CI/DI/PVC pipe lines of various sizes in West part of UWSS Bhilwara
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying ...
Construction of a New Diversion-cum- Sediment Bypass Tunnel for Restoration of Concrete Dam Construction Sluices and Sediment Management of Salal Reservoir
Supply & installation of pumps 3 H.P capacity for water supply including all electric panels, cables, level switches etc
SPECIAL REPAIR TO OTM ACCN BLDG NO P-121C AT PRC RAMGARH CANTT
Excavation in trenches in soft/loose soil not exceeding 1.5 metre deep and not exceeding 1.5 mtr width and getting out soil including forming bottom surface to required slope/gradient for laying cables/pipes,foundations,laying of cable, shafts, well, cesspits, manholes etc., not exceeding 10Sqm on plan and not exceeding 1.5m in depth complete all as specified and directed.
REPAIR/MAINTENANCE OF FLOORING, PLASTERING, TILING, SANITARY FITTINGS, LEAKAGE, SEEPAGE, OVERHEAD TANKS, ROOFING, FALSE CEILING, SUNKEN FLOORS, WCS, TAPS, PLINTH PROTECTION AND OTHER CONNECTED WORKS AT AF STN CHANDINAGAR
Disconnecting existing PVC tanks of capacity exc 250 & n exc 500 ltrers, setting aside (or lowering if required) for repairs, Cleaning and removing all scale and dirt, etc. from tanks and form mouths of circulating pipes, etc. and hoisting if required reconnecting and re-fixing the same in position and restore water supply to accommodation complete all as specified and directed.