Loading…
Loading…
9,993 results • Best match
Annual Maintenance Providing Electrical Operation, and Civil and Maintenance (including facility management services) for office and residential complexes at Bina Project for 02 years.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal outer dia Pipes
Recarpeting of Runway at Bilasa Devi Kevat Airport Bilaspur(DEPOSITE WORK) (Without Escalation and Bonus)
Concrete pipe NP 4 / prestressed concrete pipe Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe complying to IS:458, with ends casted as per the requirements of flush jointing of pipes for culverts including joints duely filled and finished with cement mortar 1:2 but excluding ...
Provid. and Fixing of diff. Dia G.I pipes (light pipes) for various Households from Jamia Masjid Peer Mohalla to H/O Peer Ataullah and Peer Gh Ahmed and others at Nowpora Baramulla under CDF of Honble MLA Bla (Javid Hassan Baig) for the year 2026-27
Sign board made on smooth wall surface mentioning the title of work at work site within 10Mtrs from the pipe laying site with lettering size upto 300mm detailing in approved shade including "CDF scheme/name of work (Name of Hon'ble MLA/Constituency)" as per aproved design/drawing. the work includes painting and finishing complete job as directed by Engineer incharge
cc road sivaji nagar
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction of two No. HPC Culverts at Sera
Providing and laying non-pressure of specified class R.C.C. pipes including collars/ spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means)
REPAIRS TO BOUNDARY WALLS COMPOUND WALLS DRAINS FENCING, HARDSTANDING AND OTHER MISC WORKS ETC AT OG LINE IN THE AOR OF AGE B/R H/L UNDER GE DEVLALI
... and not exceeding 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, laying pipe line, laying of cables or fixing poles and stays and struts etc. not exceeding 10 Sqm on plan and ...