Loading…
Loading…
9,981 results • Best match
Construction of 33 KV Sub Station Building and Boundary Wall at Hemanada (AEN Sheo).
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Construction of 33 KV sub-station building and boundary wall at Rampura (Samdari).
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Construction of 33 KV Sub Station Building and Boundary Wall at Buda Tala (AEN Bhinyad).
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
BID DOCUMENTS FOR CONSTRUCTION WORK OF C & D WASTE PLANT AND SANITORY LANDFILL FACILITY WITH OPERATION AND MAINTENANCE FOR NADIAD MUNICIPAL CORPORATION.
3.00 upper half of pipe & laying, jointing and setting bottom 924.00 rmt 2493.47
Creation of 66 kV substation Shahbad (Kurukshetra) with installed capacity of 2x25/31.5 MVA, 66/11 kV transformers plus 1x12.5/16 MVA, 66/11 kV transformer (to be provided by HVPNL) on turnkey basis
... bidder. However, the floor plan layout shall be kept same as per GELO. Design engineering, supply of labour, material, T&P and construction of control room building complete in all respect... including exterior weather proof paint, interior emulsion, all internal services like water supply including supply & providing of 5000ltr. capacity double layer Sintex/Diplast PVC tank, Sewerage system, ...
01 - Kasba baraut mai C.O Office ke piche Palika Bhumi pr Digital Study ka nirman karya.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...