Loading…
Loading…
10,346 results • Best match
Electrical work in connection with [1] Provision of additional PF Shelter at AWR, RHG, KRH, BU, MKH, PSL, HIS, AIA, GLNA, KNAR, MJNL & SRRG, [2] Provision of additional PF Shelter at BKI, DO, ARNA, BAK, JW, JHIR & KUT, [3] Provision of RCC over head tanks with capacity 2.25 lakhs litres each at Bandikui (02 nos.), Phulera (01 no.), Sanganer(01 no.) in JP Division, [4] Replacement of (MLB) by Provision of Electric Lifting Barriers (ELB) at 13 manned level crossing gates in Jaipur Division
Description:- Horizontal Directional Drilling (HDD)/Boring and trenchless cabling. Supply, transportation and insertion of self lubricated HDPE pipe and laying of cables in boring under the
DAY TO DAY MAINT and PETTY REPAIRS OF OTM and MD ACCN UNDER AGE B/R-II OF GE DEHRADUN
Attending complaints like leakge of taps, angle valve, stop coks or in pipes, fitting and removing of plumbing fittings such as Bib taps , pilllar taps, GI tubing , stop cocks, angle vales, float valves, water tanks, WCs flushing cistern, waste pipes, WHBs, EWCs and similar work for continuity ...
PETTY REPAIRS INCL DAY TO DAY MAINT WORKS TO BR AND EM FITTINGS AND FIXTURES IN MD AND OTM ACCN AT NAINITAL STN UNDER GE RANIKHET
Attending day to day complaints related to water supply only & plumbing work such as leakage of bib cock,/pillar cock/ stop cock angle valve of any description changing the washers, cleaning of air lock in the pipe, leaking low level or high level flushing cistern by adjusting the float valve and including ...
SPECIAL REPAIR FOR CONVERSION OF OH LINE LOW TENSION INTO UG CABLE FROM MAIN FEEDER TO NORTH BLOCK AREA AT RTS AND DEPOT HEMPUR UNDER GE EAST BAREILLY
... cm all around the plate with using galvanised strip 32x6 mm thick including protection pipe of 40 mm bore light grade from upper end of earth plate upto external face of the wall of the building including 20 mm dia bore GI pipe light grade as water pipe from chamber to upper edge of the plate GI funnel with wire ...
SPECIAL REPAIR TO CENTRAL AC PLANT OF DBM 12 AND 13 AT NAD KARANJA
COOLING TOWER: FRP INDUCED DRAUGHT COOLING TOWER -Supply, installation, testing and commissioning of CTI certified, factory assembled, industrial ...
Construction of Raigarh Ektal to Bade Attarmuda Approach Road Length 2.30 Km.
Providing and laying Reinforced Cement Concrete pipe NP 4 / prestressed concrete pipe (Laying Reinforced cement concrete pipe NP4 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipe excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) C 1000 mm dia