Loading…
Loading…
10,408 results • Best match
PETTY REPAIRS INCL DAY TO DAY MAINT WORKS TO BR AND EM FITTINGS AND FIXTURES IN MD AND OTM ACCN AT NAINITAL STN UNDER GE RANIKHET
Attending day to day complaints related to water supply only & plumbing work such as leakage of bib cock,/pillar cock/ stop cock angle valve of any description changing the washers, cleaning of air lock in the pipe, leaking low level or high level flushing cistern by adjusting the float valve and including ...
SPECIAL REPAIR FOR CONVERSION OF OH LINE LOW TENSION INTO UG CABLE FROM MAIN FEEDER TO NORTH BLOCK AREA AT RTS AND DEPOT HEMPUR UNDER GE EAST BAREILLY
... cm all around the plate with using galvanised strip 32x6 mm thick including protection pipe of 40 mm bore light grade from upper end of earth plate upto external face of the wall of the building including 20 mm dia bore GI pipe light grade as water pipe from chamber to upper edge of the plate GI funnel with wire ...
SPECIAL REPAIR TO CENTRAL AC PLANT OF DBM 12 AND 13 AT NAD KARANJA
COOLING TOWER: FRP INDUCED DRAUGHT COOLING TOWER -Supply, installation, testing and commissioning of CTI certified, factory assembled, industrial ...
Construction of Raigarh Ektal to Bade Attarmuda Approach Road Length 2.30 Km.
Providing and laying Reinforced Cement Concrete pipe NP 4 / prestressed concrete pipe (Laying Reinforced cement concrete pipe NP4 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipe excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) C 1000 mm dia
CONSTRUCTION OF VILLAGE AMERA TO BOIRGAON ROAD ,LENGTH 3.30 KM I/C. CULVERTS AT DISST. MAHASAMUND( MAHASAMUND DN.)
Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 1000 mm dia
Construction of Hedaspur Baheradih to Lagra Road Length 3.00 Km.
Providing and laying Reinforced Cement Concrete pipe NP 3 / prestressed concrete pipe. (Laying Reinforced cement concrete pipe NP3 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipes, excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) B 600 mm dia