Loading…
Loading…
10,347 results • Best match
Construction of Commercial Complex in Scheme No. 7, Sector 12, Shastri Nagar, Budhana Road, Meerut.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
DEPOSIT RWSS Aryad Grama Panchayath Installation of R O plant Ward 4 at Mathruka Anganvadi
100.60.1.3.2:Providing 20mm (3/4 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, ...
Construction of Urdana to Krishnapur Khairpur Road Length 3.40 Km.
Providing and laying Reinforced Cement Concrete pipe NP 4 / prestressed concrete pipe (Laying Reinforced cement concrete pipe NP4 /prestressed concrete pipe for culverts including fixing collar with cement mortar 1:2 but excluding bedding below pipe excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) C 1000 mm dia
81250/E8 PROVN OF 11KV HT AVR OF MINIMUM CAPACITY 800 KVA FOR STEPPING UP OF HT VOLTAGE UNDER GE MINNIEBAY.
Excavation in trenches any type of soil not exc 1.5 mtr wide and not exc 1.5 mtr in depth for foundation, pipe, laying of cable etc not exc 10 Sqmtr on plan and not exc 1.5 mtr in depth and getting out complete all as specified and as directed.
bandha darmpura goshala construction and maintenance vikas work 1 nit 4
... and ramming of bottoms, ncluding getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction and maintenance of missing link of sewer line and manholes at various places in Zone -1 NNJ (ARC)
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...