Loading…
Loading…
57,623 results • Best match
Work of extension of pipeline for clean water supply in Ward No. 01 Mohalla Azad Nagar under Nagar Panchayat Maharajganj.
eProcurement System Government of Uttar Pradesh Created By: Ram Chandra Created Date/Time: 23-Jun-2026 11:18 AM Tender Title: Work of extension of pipeline for clean water supply in Ward No. 01 Mohalla Azad Nagar under Nagar Panchayat Maharajganj. Tender ID: 2026_DOLBU_1144988_1
Reconstruction of roads and providing and laying of water supply pipeline in village Babupur newly extended area zone 2, under MCG Recall
reconstruction of roads and providing and laying of water supply pipeline in village Babupur newly extended area zone 2, under MCG
PROCUREMENT OF K9 DI PIPE FOR LAYING OF RISING MAIN PIPE LINE FOR DAMRA TO MOHISHILA AND BARACHAK OF ASANSOL UNDER AMRUT1.0 (PHASE IV) WITHIN AMC.2nd Call
Supply and delivery at site ISI Mark Socket and Spigot jointing system centrifugally cast DI K 9 Pipes conforming to IS 8329-2000 (Third revision) in standard length 4 m, 5 m, 5.50 m, 6 m for push-on joint (rubber gasket) with internal cement mortar lining and external protection by metallic zinc coating with finish layer of Synthetic resin/ bituminous coating of outside as per IS: 8329-2000 specification with necessary jointing material rubber gasket (IS: 5382:1985) including transportation, loading unloading and stacking at site including free supply of polyethylene sleeves for Water Supply Projects at Damra to Mohishila & Barachak scheme within Asansol Municipal Corporation.
Laying of Drinking Water Supply Pipeline and Supply and Fixing of Sluice Valves at Veerakeralam Areas in Ward no 40 of West Zone
Earth work Excavation in all soils for Water Supply Laying work Including Refilling the Excavated Earth etc complete .,
Sinking of Submersible pump with over head Tank and Pipeline near Benageria Pry. school for supply of Drinking water.
Sinking of Submersible pump with over head Tank and Pipeline near Benageria Pry. school for supply of Drinking water.
Dismantling, Laying, re-installation of 80 / 100 /125 /150 mm or higher pipeline for the purpose of Drinking Water Supply, Fire Fighting Supply and Dust Suppression Water Supply at CHP, Bina Project NCL.
Dismantling of Old Pipeline, laying, jointing, transportation and installation of GI / MS/ SS pipeline (80 mm or higher), V Groove making, Flange Making, laying on support and jointing as per site condition including NRV, Sluice Valve or any other fitting.