Loading…
Loading…
57,847 results • Best match
Laying of HDPE Pipe Line Drain at Raja StreetGandhi Road Under Councillor Fund in Div177 Unit39 Zone13
Laying of 110 mm pipe line from h/o subhas to h/o aanand at moh kila
eProcurement System Government of Uttar Pradesh Created By: Sanjeev Kumar Created Date/Time: 11-Mar-2026 03:24 PM Tender Title: Laying of 110 mm pipe line from h/o subhas to h/o aanand at moh kila Tender ID: 2026_DOLBU_1120845_11
Laying of 110 mm pipe line from H/o iqbal to sonu battery wale at moh kila
eProcurement System Government of Uttar Pradesh Created By: Sanjeev Kumar Created Date/Time: 11-Mar-2026 03:21 PM Tender Title: Laying of 110 mm pipe line from H/o iqbal to sonu battery wale at moh kila Tender ID: 2026_DOLBU_1120845_9
Laying of 110 mm pipe line from s/o zafar to h/o anees at moh jainulaabedin
eProcurement System Government of Uttar Pradesh Created By: Sanjeev Kumar Created Date/Time: 11-Mar-2026 03:19 PM Tender Title: Laying of 110 mm pipe line from s/o zafar to h/o anees at moh jainulaabedin Tender ID: 2026_DOLBU_1120845_6
Laying of 110 mm pipe line from H/o Shareef house to mahfooz House at Moh Jainulaabedin
eProcurement System Government of Uttar Pradesh Created By: Sanjeev Kumar Created Date/Time: 11-Mar-2026 03:17 PM Tender Title: Laying of 110 mm pipe line from H/o Shareef house to mahfooz House at Moh Jainulaabedin Tender ID: 2026_DOLBU_1120845_5
Laying, Jointing and Testing of DI K-7 pipe 200mm dia and C/O RCC Manhole Chamber)
Excavation in foundation (trenches for pipes and M/holes) upto all depths in all classification of earth work such as pick work, jumper work, blasting soft/hard rock or chieselling soft/hard rock where blasting is prohibited, cutting of matelled bitumenous roads / pucca pavements i/c saturated soil/ bailing or pumping out water in all lifts including trimming and dressing of sides,levelling of beds to correct grade including shoring,strutting, planking, timbering and dewatering wherever required, stacking the useable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the useable soil to trenches in 15cm (fifteen centimeters)layers including consolidating of each deposited layer by ramming and watering and then disposing of all surplus excavated soil,un-usable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and also including cost of diversion of traffic,night signals,fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts.