Loading…
Loading…
60,308 results • Best match
Restoration of road damaged by Jal Shakti department due to work namely Augmentation of water supply scheme under WSS Muthi-5 by way of laying of pipe under Rising Main, distribution and sub main line including adjoining area
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity.
Construction Of Drains And Pathways, Chambers, Laying Drinking Water Pipe Line At Bhai Bunderkar Vasahat, Captain Prakash Pethe Marg, Colaba.
Construction Of Drains And Pathways, Chambers, Laying Drinking Water Pipe Line At Bhai Bunderkar Vasahat, Captain Prakash Pethe Marg, Colaba.
Laying and Installation Pipe Line From H/o Nirapada Sardar To H/o Ramkrishna Mondal , Mouza- Dayapur , JL No - 45
eProcurement System of Government of West Bengal Created By: GOUTAM SARDAR Created Date/Time: 31-Dec-2025 12:19 PM Tender Title: Laying and Installation Pipe Line From H/o Nirapada Sardar To H/o Ramkrishna Mondal , Mouza- Dayapur , JL No - 45 Tender ID: 2025_ZPHD_957028_65
Construction of borewell at Sarund Tiraya forest area and creation of waterhole with laying of pipe line naka Sadar Sariska
Construction of Borewell at Sarund tiraya forest area and creation of Waterhole with laying of pipe line See Uploaded Documents for Itemwise
Operation and maintenance of distribution system (upto overhead reservoir/tank) and rising main pipeline of Barasat District Hospital Water Supply Scheme.
pening & closing of all the different dia Sluice Valves on different places along the alignment of the rising main and distribution main at different places by engaging labour on daily wages basis over the command area daily as and when required for regulating the supply of water and disbursing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-joining flange joints with earth work in the excavation baiing out of water, re-filling the excavaled earth, taking out of RCC slab or slab cover and reflexing ture to position etc. all complete as per the specification and direction of EIC w.e.f. 01.01.2026 to 31-12-2026 = 365 days (The operation & guarding of the installation will be guided by the enclosed terms and condition)
Installation of PVC Tubewell, Const. of P/Chamber Const. of Boundary wall Const. of CC Road . Laying of Rising main Laying of D.I. Pipe line and FHTC under JJM