Loading…
Loading…
60,377 results • Best match
Construction of borewell at Sarund Tiraya forest area and creation of waterhole with laying of pipe line naka Sadar Sariska
Construction of Borewell at Sarund tiraya forest area and creation of Waterhole with laying of pipe line See Uploaded Documents for Itemwise
Operation and maintenance of distribution system (upto overhead reservoir/tank) and rising main pipeline of Barasat District Hospital Water Supply Scheme.
pening & closing of all the different dia Sluice Valves on different places along the alignment of the rising main and distribution main at different places by engaging labour on daily wages basis over the command area daily as and when required for regulating the supply of water and disbursing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-joining flange joints with earth work in the excavation baiing out of water, re-filling the excavaled earth, taking out of RCC slab or slab cover and reflexing ture to position etc. all complete as per the specification and direction of EIC w.e.f. 01.01.2026 to 31-12-2026 = 365 days (The operation & guarding of the installation will be guided by the enclosed terms and condition)
Installation of PVC Tubewell, Const. of P/Chamber Const. of Boundary wall Const. of CC Road . Laying of Rising main Laying of D.I. Pipe line and FHTC under JJM
Tirupathur District SFC DP 2025-26 Construction of pipeline with household water supply (FHTC) connection in Erudukkaran Taluk, Poonkulam Panchayat Alangayam Block Package No.06
Tirupathur District SFC DP 2025-26 Construction of pipeline with household water supply (FHTC) connection in Erudukkaran Taluk, Poonkulam Panchayat Alangayam Block Package No.06
Providing and Laying PVC Pipe & Materials, HDPE Pipe and Materials and DI Sluice Valve 100 mm, 150 mm dia PN 16 at various palces in Ward No.36 Ballari City
Providing and Laying PVC Pipe & Materials, HDPE Pipe and Materials and DI Sluice Valve 100 mm, 150 mm dia PN 16 at various palces in Ward No.36 Ballari City
Facility Management Services - LumpSum Based - Industrial; Job Contract for Supply and Replacement of 50mm Water Cooling Pipelines at SAF-I, II&III and Replacement of filter bags of SAF-III Fume Extraction System; Consumables to be provided by service..