Loading…
Loading…
60,740 results • Best match
Improvement of water supply by making inter connection of existing tube well to UGR by Providing and laying 100 mm dia DI pipe including redevelopment of 4 no tube well in high water table area on DJB land in AC-02 Burari under EE(C)-12.v
ESTABLISHMENT OF BORE WELL NEAR PRIMARY SCHOOL PATEL NAGAR AND PIPE LINE LAYING FROM SCHOOL TO PATEL NAGAR IN NAGAR PANCHAYAT NARAINI
1- ESTABLISHMENT OF BORE WELL NEAR PRIMARY SCHOOL PATEL NAGAR & PIPE LINE LAYING FROM SCHOOL TO PATEL NAGAR IN NAGAR PANCHAYAT NARAINI.
ESTABLISHMENT OF BORE WELL NEAR TOILET BHOJE TALAB AND PIPE LINE LAYING FROM BHOJE TALAB TO ATARRA ROAD IN NAGAR PANCHAYAT NARAINI
4-ESTABLISHMENT OF BORE WELL NEAR TOILET BHOJE TALAB & PIPE LINE LAYING FROM BHOJE TALAB TO ATARRA ROAD IN NAGAR PANCHAYAT NARAINI.
DEPOSIT Utility shifting work in Tank Bund Road KMRL KIIFB Laying 160mm PVC pipe and 90mm PVC pipe along Chilavanoor Bund Road in div no.57 New 28 Old of Kochi Corporation Pipeline Work
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
Providing and laying of HDPE pipe line and smart control irrigation system around Nehru Park and Peshwa road and connecting Roads.
Providing and laying HDPE Pipe confirming to IS:4984(as amended) suitable for respective working pressure with all the... coupling, tees, bends reducers,screwed adaptors ,flanged, etc. jointing with any dia. pipe including trenching, refilling & testing of joints complete as per direction of Engineer-in- Charge. 160 mm pipe PN 10 PE100 of make Duraline/Supreme/Dinesh/Astral/Jain or equivalent.
Const of appro bridge, compound wall for water treatment plant, SCADA Auto and drink water Pipeline from vill Bhota to Bhon including ope and maint for period of 10 years for Water supply scheme of 15 and 10 villa of Purna river of Jigaon project
1 Construction of approach bridge, compound wall for water treatment plant, SCADA -Automation and drinking water Pipeline from village Bhota to Bhon including operation & maintenance for period of 10 years for Water supply scheme of 15 villages on left bank and 10 villages on right bank of Purna river of Jigaon ...