Loading…
Loading…
60,844 results • Best match
Laying of 150 mm New DI Pipe at Vallalar Nagar OHT to Maruthamalai Main Road in Ward No.38 of West Zone
Earth Work Excavation in all soils for water Supply laying work including Refilling the excavated earth etc,., complete
AMtc of EPHS in Sector 7 Kurukshetra Providing laying and jointing and cutting of 200mm 250mm pipe for the repair of pipe line complete in all respect and all other works contingent
[20.68.1]Providing, lowering, laying in trenches, aligning, fixing in position and jointing at all level/depths Ductile Iron... ring (EPDM/SBR) joints such as tees, bends, tapers, caps etc. with in trenches in DI pipe line complete including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 1. Up to 300mm ...
Providing and laying of 4 inch i/d DI water supply pipeline in place of old damaged CI water supply line backside haryana roadways from plot no 182/29 to 182/84 at Ind Area Ph-1, Chd Ch to capitral head augmentation of W/s system
Repair and rectification of underground water supply connection due to damage during the laying of new DI Water supply pipeline including cost of pig lead, hemp yarn, rubber sheet, nut bolt, specials pipe of same size etc. complete in all respects to the entire satisfaction of EIC. (NSI)
Improvement,Extension And Augmentation of water Supply Scheme in G.P.Dhelu, Nichala Garoru,Dart Bagla etc. in Tehsil. J.Nagar Distt. Mandi HP. NABARDSH Laying ,jointing,Carriage and testing of G.I. Pipe 40 mm dia From I to I 17,I 18
... earth work such as pick wok,jumper work,saturated soil including balling or pumping out water blasting soft or hard rock or chiselling or wedging,out of soft/hard rock,where blasting ...
WATER/PIPELINE/YEARLY
... exiting distribution main of any type including excavation breaking & removing existing pipes, lowering, laying, of specials & pipes I the position, refiling, closing the water supply in that area, dewatering & restarting the water supply etc. complete as directed by Engineer ...
Sw - Supply of unskilled labour wheel valve operation maintenance of water supply pipeline network as an when required in Swarajgram Section for 01 Year from April 2026 to March 2027
Supply of labours required for filter bed operation, wheel valve operation distribution of water supply and day to day maintenance of water supply network system under the jurisdication of Swarajgram section.