Loading…
Loading…
61,222 results • Best match
Providing Laying and Jointing of Pipe Line for Village 2 LC Dhanis Under MLA LAD Under Sub Div Raisinghnagar Division Anoopgarh
"Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical... release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, ...
Laying of 110mm dai 6kg/cm PVC Pipe Line at Maleen Basti surrounding the Dhobiwala Talab Gote Shah Road ward 63
Supply & Fixing of following PVC Pipe line 110 mm Ø 6Kg/cm2 Pressure ISI mark with all jointing and laying complete I/C all labour T&P and all materials
Providing Laying and Jointing of Pipe Line for Village 5 LPM Dhanis Under MLA LAD Under Sub Div Raisinghnagar Division Anoopgarh
"Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical... release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, ...
SH Providing Laying Jointing and Testing of HDPE pipe 40mm OD PN-10 PE 80 2200 Rmt. from Behri to Rathoh.
Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting ...
Repair/Laying of Pipe for WSS at Village Bhajori Panchai Block Chiralla under Demand 33 (MH4235 Capex) DMRRR Department (JKSSR 2022)
Providing Laying and fitting of G.I. pipes (all classes) complete including cost of pipes, Excluding cost of Earthwork and refilling etc . G.I Pipe 15mm ϕ
Laying of 150mm D.I. K7 Raising Main Pipe line From TubeWell To Raising Shifting Work In Moh-Muglushah W.N. 25, Najibabad
Provision for Large crossing of nala,raod & culverts including shifting of telephone cabel etc.along the alignment of pipe line including supply of C.I Tyton pipe and special and also jointing material their laying and jointing testing etc. complete. (Upto 3.50Mtr for Nala,Road,Hole etc)