Loading…
Loading…
60,996 results • Best match
Repair/Replacement of Water Supply Pipeline and Sanitary Fittings in Various Public Toilets in PVR Complex, Vikas Puri in Ward No. 103/WZ, Keshopur.
OandM - Water Supply Schemes-Annual Maintenance of Various size of Pipe lines-WSS to Thiruvaniyoor Panchayath for the period of 2026-27-Pipeline Work
100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular ...
Laying of 110mm HDPE Pipe line From Near Qabristan Wall To Near H/o Shri Atikurrehman In Moh-Makbara W.N.-04, Najibabad.
Carting from the store the following sizes of HDPE pipe and specials to the site of work lowering them in to trenches and laying true to alignment and gradient including jointing, testing of pipeline and including supply of jointing material such as nut & bolts, rubber insertion, white lead etc. com- plate ...
.Laying of 25 mm , 20mm dia PVC underground pipe line for Sanjabani Nursing home , AC-276, Booth No-197, under DMC area.
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: SUJAL NANDI Created Date/Time: 16-Jan-2026 06:38 PM Tender Title: Laying of 25 mm , 20mm dia PVC underground pipe line for Sanjabani Nursing home , AC-276, Booth No-197, under DMC area. Tender ID: 2025_MAD_5004594_3
Laying of 200 DI-K7 Raising Main Pipe line From New TubeWell To Raising Shifting Work In Moh-Mehndibagh W.N. 15, Najibabad
Provision for Large crossing of nala,raod & culverts including shifting of telephone cabel etc.along the alignment of pipe line including supply of C.I Tyton pipe and special and also jointing material their laying and jointing testing etc. complete. (Upto 3.50Mtr for Nala,Road,Hole etc)
Laying of 110mm HDPE Pipe line From Near Dr. Sharma To Near H/o Shri Zameel In Moh-Muglushah W.N.-25, Najibabad
Carting from the store the following sizes of HDPE pipe and specials to the site of work lowering them in to trenches and laying true to alignment and gradient including jointing, testing of pipeline and including supply of jointing material such as nut & bolts, rubber insertion, white lead etc. com- plate ...