Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 LAccepted-Finance | ₹15.0 L | 1 | Accepted-Finance lowest |
| 2 | 2₹15.7 LAccepted-Finance | ₹15.7 L | 2 | Accepted-Finance 2nd lowest |
| Sl No | Description | Qty | Unit | Alias.K.Kuriakose L2 | Varghese Paul L1 |
|---|---|---|---|---|---|
| 1.00Working charges | |||||
| 1.00 | OD320222/2025-2026:Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying
the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(80mm Joint leak) | 1 | Leak | 1,082.23 ₹1,082.23 | 1,033.04 ₹1,033.04 |
| 1.00 | OD320223/2025-2026:Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(100mm Joint leak) | 1 | Leak | 1,207.84 ₹1,207.84 | 1,152.94 ₹1,152.94 |
| 1.00 | OD320219/2025-2026:Repairing leakage/breakage of 150 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(150mm Joint leak) | 1 | Leak | 1,547.9 ₹1,547.90 | 1,477.54 ₹1,477.54 |
| 1.00 | OD320225/2025-2026:Repairing leakage/breakage of 200 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(200mm Joint leak) | 1 | Leak | 1,788.99 ₹1,788.99 | 1,707.67 ₹1,707.67 |
| 1.00 | OD320226/2025-2026:Repairing leakage/breakage of 250 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(250mm Joint leak) | 1 | Leak | 2,021.6 ₹2,021.60 | 1,929.71 ₹1,929.71 |
| 1.01 | OD320220/2025-2026:Repairing leakage/breakage of 300 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(300mm Joint leak) | 1 | Leak | 2,569.24 ₹2,569.24 | 2,452.46 ₹2,452.46 |
| 1.01 | 100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 2 | no | 3,816.39 ₹7,632.78 | 3,642.92 ₹7,285.84 |
| 1.01 | 100.46.1.2:Repairing leakage/breakage of 100mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 5 | no | 4,238.48 ₹21,192.40 | 4,045.82 ₹20,229.10 |
| 1.01 | 100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 12 | no | 5,058.86 ₹60,706.32 | 4,828.91 ₹57,946.92 |
Tender Value
₹14.3 L
EMD Value
₹35,756
Closing Date
6 May 2026, 3:00 pmClosed
Assistant Executive Engineer
WS Sub Division Puthencruz
OandM - Water Supply Schemes-Annual Maintenance of Various size of Pipe lines-WSS to Thiruvaniyoor Panchayath for the period of 2026-27-Pipeline Work
2026_KWA_848974_1
WSS PTCZ/1/ 2026-27
Open Tender
Civil Works - Others
Thiruvaniyur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹35,756
7 May 2026
29 Apr 2026
7 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Working charges | ||||||
| 1.001 | OD320222/2025-2026:Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying
the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(80mm Joint leak) | - | Leak | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | OD320223/2025-2026:Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(100mm Joint leak) | - | Leak | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | OD320219/2025-2026:Repairing leakage/breakage of 150 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(150mm Joint leak) | - | Leak | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | OD320225/2025-2026:Repairing leakage/breakage of 200 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(200mm Joint leak) | - | Leak | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD320226/2025-2026:Repairing leakage/breakage of 250 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(250mm Joint leak) | - | Leak | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | OD320220/2025-2026:Repairing leakage/breakage of 300 mm AC pipe line by cutting and dismantling the damaged
pipe portion including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing
leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required
length, re jointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and
rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches
using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering,
charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials,
bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per
the direction of Departmental officers excluding the cost of CID Joints.(300mm Joint leak) | - | Leak | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | 100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | - | no | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 100.46.1.2:Repairing leakage/breakage of 100mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | - | no | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | - | no | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Conditions.pdf
Tender Documents • 1.40 MB
BOQ_1434635.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid