Loading…
Loading…
61,265 results • Best match
Laying of sewerage Line in both villages (Sakatpur and Hasanpur) and construction of IPS in village Hasanpur. AUGMENTATION OF W/S SCHEME SAKATPUR and HASANPUR BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES.
Providing and inserting of trenchless of 600mm RCC NP3 pipe including boring/excavation, providing and inserting of 1100mm MS pipe 12mm thick, MS Spacer at 2m distance, 600mm RCC NP3 pipe, excavation for receiving pit as per direction of Engineer-in-charge.
Providing and fixing of water supply pipelines from WTP to Dining Block Terrace at IIITDM Kancheepuram
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.
Providing, Laying Jointing and Testing of GI Pipe various dia and Rising Main 200mm dia MSERW pipe 4.80 thickness at various locations and Providing Supplying and Fixing of Gun Metal Gate valve at various locations UNDER PDNA
Providing , laying,jointing ( by way of circumfrential butt welded joints by electrical arc welding ) and testing of MSERW pipe of following dia meters confirming to BIS 3183-2007, steel grade specified below (latest... tapers , all short pieces, beds etc. as per site requirement made from parent tubes . The laying of pipe will include all operation such as cutting, welding, jointing, fabrication of bends, ...
Prov. and Laying of sewer pipe line 8 inch dia at Patti Sohan wali,Dharampura Chowk Main Bazar Verka,Ward No.19,East Constituency.
Prov. and Laying of sewerage pipe line 8 inch dia at Patti Sohan wali, Dharampura Chowk Main Bazar Verka,Ward No.19,East Constituency.
LAYING OF 100 MM DIA. DISTRIBUTION PIPE LINE OF POWER DRIVEN TUBE WELL AT TALTALA BAZAAR STREET AND ITS SURROUNDING AREAS IN WARD NO 53.
Tender Inviting Authority: Executive Engineer(Central), WATER SUPPLY DEPARTMENT
Rough Cost estimate for Providing and laying of 150mm DI Pipe rising main and construction of Temperature chamber room in Sector-23 Bhiwani