Loading…
Loading…
62,054 results • Best match
Relaying of DI pipe 150mm Dia K7 80 Rmt 300mm dia K7 30 Rmt 400mm dia K7 50 Rmt and laying jointing and Testing of HDPE pipe 225mm dia PE PN 4.00 90 Rmt 160mm dia PE 80 PN 4.00 20 Rmt
Laying, jointing and testing commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1995 with fusion welding process including all necessary fittings in all leads and lifts to the entire satisfaction of Engineer-in-charge (Earth work in trenches to be measured and separately) HDPE pipe 225mm dia PE 80 PN 4.00
CONSTRUCTION OF CD AT WNO 15 LAYING OF HUME PIPE AT WNO 5 CONSTRUCTION OF WALL BEHIND TMC OFFICE AND CONSTRUCTION OF TOILET BLOSK NEAR AMBEDKAR BHAVAN GANGA NAGAR
CONSTRUCTION OF CD AT WNO 15 LAYING OF HUME PIPE AT WNO 5 CONSTRUCTION OF WALL BEHIND TMC OFFICE AND CONSTRUCTION OF TOILET BLOSK NEAR AMBEDKAR BHAVAN GANGA NAGAR
Constructing Water Pipeline in Nandurmadhyameshwar Tal Niphad Dist Nashik
Constructing Water Pipeline in Nandurmadhyameshwar Tal Niphad Dist Nashik
Supply Erection and Commissioning of New Pumps for flood protection works at Village Bhaini Surjan RCC pipeline Jui feeder including stages in Water Services Mechanical Division, Rohtak. ( Stage -1)
Supply, Erection & Commissioning of 10 C/s axial/Mix Flow Water lubricated Vertical Pumps of 10 Cs. Discharge at 1440 RPM at static head of approx 6.0 Mtr. with Y body, including MS Bend including flange welding, SS Nut & Bolts etc complete in all respect as per site requirement with epoxy coating and strainer & as per approved specifications of the department
Supply Erection and Commissioning of New Pumps for flood protection works at Village Bhaini Surjan RCC pipeline Jui feeder including stages in Water Services Mechanical Division, Rohtak. (Stage-II)
Supply, Erection & Commissioning of 10 C/s axial/Mix Flow Water lubricated Vertical Pumps of 10 Cs. Discharge at 1440 RPM at static head of approx 6.0 Mtr. with Y body, including MS Bend including flange welding, SS Nut & Bolts etc complete in all respect as per site requirement with epoxy coating and strainer & as per approved specifications of the department
O M Water Supply Schemes Annual mace 2026 27 RWSS to Angadi Leak rectification works to pipe line for the year 2026 27 in Angadi Grama Panchayat Pipeline Work
OD37115/2026-2027: Leak rectification work in 32/40/50 mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular ...