Loading…
Loading…
62,051 results • Best match
Providing and laying new drainage pipe line and connecting to the municipal manhole outside the premises of CTO building, Secunderabad. (Work diverted to KS LANE staff quarters compound).
Providing & laying PVC SWR soil waste pipes (SN-8 - Orange colur pipes of aashirvaad or other approved make - UGD PUSHFIT SYSTEM PIPES) conforming to IS 16098 (Part 1) : 2013 standard Type B including jointing with 'T' ...
PROVIDING AND LAYING PIPE CULVERT AT W NO 5 AT 1) NOOR BAGH ROAD 2) SR NO 65 MMC SCHOOL 3) MILAN BECKRY AND VARIOUS PLACES AT MALEGAON
PIPE CULVERT
REPAIR REPLACEMENT OF UNSERVICEABLE AVIATION LIGHTS, PIPELINE FOR WATER SUPPLY, VALVEPIT, EARTHING, TANK CLEANING, FILTER MEDIA CHANGING AT MD ACCN AREA AT SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
Supply, laying, jointing & testing 3-layer PP-R (Polypropylene random copolymer) concealed pipes, 90 mm outer dia, SDR 11 (PN10) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings such as bends, ...
The Work of laying 300 mm dia heavy duty hard spirals rigid reinforced PVC pipe inside 1800X900 mm existing SWD line by using various type of bends and laying out flat flexible hose through Moon furniture outfall river at LBS Road Kurla
The Work of laying 300 mm dia heavy duty reinforced of hard spirals of rigid PVC pipe inside 1800X900 mm existing SWD line by using various type of bends and laying out flat flexible hose through Moon furniture outfall to Mithi river at LBS Road, Kurla (W).
Earthwork in excavation in trenches for laying of underground pipeline, lowering and jointing of RCC pipes of various diameters, fixing of airvent pipes, risers, alfa-alfa valves and pump stand pipes at 3 different sites
Earth work in Excavation in trenches, lowering and jointing of RCC pipes, fixing of risers, alfa alfa valves, air vent pipes and pump stands
CO of RCC Trench weir at Rokti Nalah CO Wire crate protection wall along the right bank of Rokti KhadRD 9 to 54 Laying, Jointing in trenches and Testing of HDPE Pipe 90mm Nominal dia 2 layers at RD 9 to 460 Jacketing of Sedimentation tank an