Loading…
Loading…
57,224 results • Best match
RC Water Supply Schemes 2025 2026 TWSS MACE Annual maintenance of water supply distribution network Right side of Karamana Pipeline Work
100.9.2:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 25 mm nominal outside diameter pipes.
RC Water Supply Schemes 2025 2026 TWSS MACE Annual maintenance of water supply distribution network Left side of Karamana Pipeline Work
100.9.2:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 25 mm nominal outside diameter pipes.
Extention of Water Supply Pipeline At Deur Bk Tal Dist. Dhule Under 15FC VP Level Activity Code 110902887
Extention of Water Supply Pipeline At Deur Bk Tal Dist. Dhule Under 15FC VP Level Activity Code 110902887
Estimate for repairing and maintenance of Darnoo Colony water supply, cupboard, laying HDPE pipe, sanitary items in Chief Office, Rest House etc. under Electrical Division HPSEBL, Dharamshala.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 20 mm nominal outer dia Pipes
DepositARWSS to Avoly202526 Avoly Panchyath New Pipe laying work at Swapnabhoomi in Avoly panchayath ward NoIV Pipe line work
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
DEVELOPMENT OF FILTERED WATER SUPPLY BY LAYING OF 100 MM DIA. D.I. PIPE WITH M.S. SADDLE CONNECTION FROM 19 TO 18, SARAT CHATTERJEE AVENUE IN WARD NO. 87.
Hydraulically testing of C.l./D.I/A.C pipe lines in sections, under a head of water not less than 60m{6Kg/Cm....pressure) or above as per specific requirements by filling the main with supply of water including supply of all specials and equipments like pump sets, gauges, end caps blank flange etc.all complete as per specification and direction of the Engineer-in-Charge.[After successful completion of test. removal of ancillary specials.equipments. plugging arrangements and disposal of water sholl be made at no extra cost] Diameter in mm 100