Providing and laying of MazzaA.C. Pressure delivery pipe 450mm Cl-20 in trenches upto 1.5 mtr depth at site of pump canal 0.000 km to 0.150 km, Providing and laying of MazzaA.C. Pressure delivery pipe 200 mm Cl-20 in trenches upto 1.5 mtr depth at si
providing and laying of mazza A.C. pressure delivery pipe 700mm Cl-20 in site of sulmai pump canal from river sufficient water ponit to intake water point of well for replace damage underground M.S. pipe with all cost of material, labour and T&P etc. for proper completion of work as per direction of engineer in charge.
1. Providing and laying RCC NP-3 pipe of 1200 mm dia of total length 2100 Mtr has been proposed in the estimate. 2. Providing and laying MS pipe of 1200 mm dia of total length 164 Mtr using trenchless method has been proposed in the estimate.
Providing stringing out, jointing, cutting, and testing of 1200mm M.S. pipe of 15mm thickness to be procured from SAIL/Jindal/TATA/Welspun/SKS Pipes only made up of M.S. plate of minimum 15mm thickness as per IS:2062, IS:3589-2001 with ...
Construction of OHT Water Tank and Water Supply System at KUMS Dungarpur, Distt. Dungarapur
eProcurement System Government of Rajasthan Created By: M. SELVA KUMAR Created Date/Time: 22-May-2026 02:04 PM Tender Title: Construction of OHT Water Tank and Water Supply System at KUMS Dungarpur, Distt. Dungarapur Tender ID: 2026_RSAMB_555706_10
Installation of Submersible Pump with Water Tank and pipeline at Shankaribazar Mansatala Bazar in ward no. 04 under Bishnupur Municipality. ( Scheme Id- APAS/01/255/96/0002
Installation of Submersible Pump with Water Tank and pipeline at Shankaribazar Mansatala Bazar in ward no. 04 under Bishnupur Municipality". ( Scheme Id- APAS/01/255/96/0002 - Ref:- estimate
BUDHSELLY Annual Maintenance Estimate for Water Supply Scheme BUDHSELLY
H.S.R. Item:-Budhselly : Annual maintenance water supply scheme, `Taking out all layer filter media and replacing the same after washing, screening, cleaning and providing and placing of new filter media at water works Budhselly and all other works contingent thereto ". Rs 2.36 Lakhs
4.Repairs to Varvand Water Supply Scheme Tal.Bhor
Sub-Estimate No.1 : Repairs to Existing Percolation well Item No.1 :- Desilting the supply Well intake Well Head Works Sump of Water Supply / Sewerage Works etc in wet or dry condition icluding lifts Upto 9.00m & Lead of