T-07/EUDCB/2025-26
PCC Pole/STP (8.5 mtr Long)
Estimate for RM of HT LT Lines at various location CESD, HPSEBL,Boileauganj under the jurisdiction of this division.
3 De-stringing, re-laying, re-stringing &re- sagging of ACSR 6/1./2.59 mm2 conductor along with binding with insulator, nuts and bolts in the STP complete the job in all respect atAndri mtr 0.0 12
CONSTRUCTION OF 33KV LINE FOR 33/11KV SUBSTATION BILARIDEEH (JIWADHIPUR TO JASORI), DIST. CHANDAULI ON SEMI TURNKEY BASIS.
X-Arm clamp for STP/PCC
Work of Boiler Rotary part of U 1 to 6 of 250 MW each at SSTPS Suratgarh
200154482 Installation Commissioning and CAMC of equipment for CEMS and EQMS data connectivity with CPCB SPCB and NTPC Clouds PI Server NSTPS
Deployment of manpower for supportive services in hospital of NTPC Nabinagar