Loading…
Loading…
3,476 results • Best match
Water proofing treatment, boundary wall repairing, plinth protection, plaster work, seepage treatment, platform for water tank, exterior finishing work and others repair work at Botany Department, University of Delhi
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations : (a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120 mm and minimum thickness at khurra as 65 mm.
Operation and Maintenance Services for Water Supply, Raw Water Pump Station and Water Treatment Plant at DRDO Complex, Ojhar, AMBE Hill, Nasik
OPERATION AND MAINTENANCE OF WATER SUPPLY, RAW WATER PUMP STATION AND WATER TREATMENT PLANT AT DRDO COMPLEX,OJHAR (AMBEHILL, NASIK. (Percentage Rate Schedule for Item No . 1.01 Only)
COMPREHENSIVE OPERATION & MAINTENANCE CONTRACT OF WATER TREATMENT PLANT FOR NEW 100TPH GAS-FIRED BOILER AT POWER PLANT, DSP
Operation and guarding of Pumping Machineries at Raw Water Pumping Station at Water Treatment Plant under NTK Water Supply Project.
Provision of Water Treatment Plant based on RO Technology (2000 LPH) complete in all respects
Provision of Water Treatment Plant based on RO Technology (2000 LPH) complete in all respects
Construction of protection work of the water treatment plant Binwa under PDNA
Excavation In foundations, trenches etc., in earth work,lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm layers, when required in to plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in lead of 20 metres complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .