Loading…
Loading…
3,485 results • Best match
Day to Day operation and Maintenance of 52 MGD (236 MLD) Capacity Water Treatment Plant for Falta-Mathurapur Mega Project at Dongaria for 1 (one) Year including supply of all required chemicals, Laboratory reagents, deployment of required manpower ..
Day to Day operation and Maintenance of 52 MGD (236 MLD) Capacity Water Treatment Plant for Falta-Mathurapur Mega Project at Dongaria for 1 (one) Year including supply of all required chemicals, Laboratory reagents, deployment of required manpower and security guards for all Civil & Electro-mechanical units and it’s repair with maintenance of Sludge pumping machineries, 5 nos. HSC (1600 KW) Delivery pumping units with 3940 m3/hr. flow rate & 101 mtr. head, 33KVA/6.6 KVA/ 0.433 KVA Sub-station, operation and maintenance of water testing laboratory maintenance of fully automated SCADA by Civil / Electrical Engineer including maintenance of Air conditioning system, video surveillance, indoor/ outdoor illumination system, garden and time to time jungle clearance and sludge removal etc. as per directions of EIC under South 24 Pgns. W/S Division-I, PHE Dte.
TIWSA MINI INDUSTRIAL AREA M and R to Road and WSS at Tiwasa Mini Indl. Area for 2026 27 Providing final asphalting treatment to internal roads and interim water supply arrangement in industrial area
DG - TIWSA(MINI) INDUSTRIAL AREA...M & R to Road and WSS at Tiwasa Mini Indl. Area for 2026-27…. Providing final asphalting treatment to internal roads and interim water supply arrangement in industrial area.
Improvement to various school building under Education wing. SH Water proofing treatment replacement of old chequered tiled with PLC pavers plaster work of parapet walls and other allied civil work in AAPV Ashoka Hotel Kautilya Marg
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound, without damagening of any part/component of exisiting plumbing systems arranged on roof slab having various utility services i.e. portable water pipe lines, water tanks AC Machines etc. water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm.(b) laying second layer of Fibre glass cloth when the first layer is stillgreen. Overlaps of joints of fibre cloth should not be less than 10 cm.(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. ( No any extra charges will be paid to the agency for prevent the utility services laid at roof slab, any damaged during execution of work shall be repaired free of cost).
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - HURL Barauni Township; Design and supply of Water pre-treatment Plant of 30 cubic meter per hour Capacity (2 nos) at HURL Barauni Township; As per scope of work
and Installation of Plant Systems/Equipments (Version 2) - HURL Barauni Township; Design and supply of Water pre-treatment Plant of 30 cubic meter per hour Capacity (2 nos) at HURL Barauni Township; As per scope of work
Zonal Contract for up-keepment of building and structures, water pipe line connections and water treatment plants and GM Bunglow at 8, Belvedere Park, Officers Flat at 90, Chowringhee Road, 6, Ramesh Mitra Road and 200X, S.P. Mukherjee Road, Officers ... with water treatment ... water treatment installations, ...
The work includes major repair of residential quarters comprising repair and painting of buildings, roof treatment for waterproofing, replacement of damaged flooring, doors and window shutters, construction of new overhead water tanks at roof level,