Loading…
Loading…
3,151 results • Best match
PROVN OF SCADA FOR STP IRP UNDER GE EAST BAREILLY
Designing, Supplying, Developing, lnstallation, Integrating and Commission 06 Nos STPs (a. STP JRC Cap - 1.00 MLD, b. STP No. 42 Cap - 348 KLD, c. STP MH Cap - 150 KLD, d. STP Lal Phatak Cap - 461 KLD, e. STP 80 ORs Cap- 90 KLD, f. STP Hill Track Road Cap- 1.2 MLD ) SCADA System along with various Automation equipment for STP as indicated and as per details attached. The STP SCADA system shall comprise of following: (a) Central Monitoring Station (CMS) with personal computer with latest processor and monitor 13th generation intel (R) core, window 11, i7 processor, (b) 2 KVA UPS with two hours backup. (c) Colour laser Printer. multifunctional two No for A-3 & A-4 sheets with high quality two sided color printing, scanning and copying, print speed 25 PPM, USB, WiFi , wireless suuitable for scan to PDF, from USB flash drivwe port Make : HP or equivalent (d) Server (All 6 STPs Data can be monitored at a time). (e) Data Gateway. (f) SCADA software which can be operated, programmed and modified by agencies other than developer. (g) PLC/ Microprocessor Controllers with indoor/ outdoor applications for water sensing display, pump operation with RTU / without RTU or Microprocessor controller and microprocessor transmitter. (h) Suitable communication system including payment of bills to telecom service provider. (j) Pressure transmitters as per site requirement (k) Ultrasonic sensors , (l) Flow-meters and switches (m) Online Continuous Efluent Monitoring System (OCEMS) for both raw and treated water (COD, BOD, TSS, PH, Amonia, temprature etc )
EOI for sale of dry fly ash from STPS
NIT for Mega All Risk Insurance Package for STPS
MEGA ALL RISK PACKAGE INSURANCE POLICY FOR THE ASSETS OF SANTALDIH THERMAL POWER PROJECT (STPS) IS DUE FOR RENEWAL WITH EFFECT FROM 00:00:00 HOURS OF 17.07.2026 to 24:00:00 HOURS OF 16.07.2027 ( AS PER SECTION II, III AND IV OF BID DOCUMENT)
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP 1.35 MLD for 3 years period).
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Zone No. II of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP 0.68 MLD for 3 years period)
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Zone No. III of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
CONSTRUCTION OF STP OPERATOR ROOM WITH ATTACHED WASHROOM AT INDIAN INSTITUTE OF MANAGEMENT LUCKNOW
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.