Loading…
Loading…
3,158 results • Best match
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP of 3.13 MLD for 3 years period
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Zone No. I of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
Operation and maintenance of complete sewer net work manholes chamber, flushing tanks and STP of 0.57 MLD for 3 years period )
To operate, repair & maintain all civil works and electro-mechanical equipments relating to sewerage system to Ward No. 11 of Hamirpur town which consist of sewage treatment plant and sewer network including cost of 1 No. monthly sample testing charges by HPPCB for the period of 3 year in all respect to the entire satisfaction of Engineer-in-Charge. Firm should do comply the stringent effluent standards laid down by HP. Pollution Control Board and terms and conditions as per Annexure A to M alongwith general terms and conditions. Operation, Repair and maintenance shall cover following components.
Comprehensive Maintenance Contract of the existing STP, WTP, Water Supply System (WSS) and Borewell for Raiganj Government Medical College and Hospital (Site-1 Site- 2) under the jurisdiction of WBMSCL for a period of 1 year
Restoration of the entire Sewage Treatment System, Water treatment system, Water Supply System and Bore well with proper Cleaning of Equalizer Tank, MBBR tanks with fixation of Air Blowers
Electrical work in connection with (i) Provision of 2 Family suits and 6 individual suits at ORH GZB in lieu of Old ORH. (ii) Construction of underground tank & pump house, electric sub-station, improvement to water supply system under ADEN/GZB (iii) ... effluent treatment plant ... treatment plant at
Supply, installation, testing & commissioning of 25 ltrs stationary storage type 44 electric water heater (Geyser) having BEE star rating- 5 star, Installation : vertical, ABS Body, element wattage - 2kW, Tank capacity - 25 ltrs, conforming to IS 2082:2018 or latest complete and as per site requirement & as per explanatory note. Make : Havells, Bajaj, Usha or equivalent.
investigation survey construction of 300,400,700kld stp at NP Saidpur Dist Budaun
Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP- 300 KLD with Coarse Screen Chamber With Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if required to achieve treated effluent parameters as per NGT Norms ), lifting up of waste water/ raw water with pumps, sludge handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required for complete campus and allied works in an odour free environment as per scope of bid document with one year of defects liability period for civil works and two year DLP for e/m works that shall include but not limited to getting NOC from different departments , vetting of design drawing from IIT/any govt. technical reputed institute, third party testing of influent, treated effluent, sludge and other related works. Note- IN case of technology provider , technology provider must have register office in india.
400kld Stp 3KLd co treatment Leach pit,Interception of Drain
Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP with Chlorine Tank- 400 KLD with Coarse Screen Chamber With Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if required to achieve treated effluent parameters as per NGT Norms ), lifting up of waste water/ raw water with pumps, sludge handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required for complete campus and allied works in an odour free environment as per scope of bid document with one year of defects liability period for civil works and two year DLP for e/m works that shall include but not limited to getting NOC from different departments , vetting of design drawing from IIT/any govt. technical reputed institute, third party testing of influent, treated effluent, sludge and other related works. Note- IN case of technology provider , technology provider must have register office in india.